Owner manual

MFS GUARDRAIL SAFETY PIN MFS OUTRIGGERS
DANGER
This metal equipment is conductive. Do not use near electrical circuits. Serious injury or death could result.
WARNING
Do not use this equipment if you are in poor health, taking medications, drugs, or drinking alcoholic beverages, all of which may impair
your ability to work safely on this product.
Do not mix platforms, casters, trusses, end frame access ladders or other components from other manufacturers with FramePro
scaffolding. Component dimensions differ enough to be hazardous when mixed. Use only authorized FramePro parts and components.
Discard the scaffold if it has been exposed to fire or corrosive chemical.
Do not overreach. Keep your body within the boundaries of the guardrail and scaffold section.
Do not stand on guardrail or use any components of the guardrail to gain additional standing height.
Do not place ladders, chairs, boxes or any other such object or device on the platform to gain additional standing height.
Do not try to pull or “scoot” yourself from one location to another while standing on platform. Climb down from the platform to the
floor. Mount and dismount the platform from the top center of the End Frame Access Ladder. Do not swing around the side of the
ladder. Unlock the casters and move the scaffold in a safe manner. Relock the casters before climbing to the working platform. For
easier locking and unlocking of the casters, turn the brake levers outward.
Do not subject the FramePro scaffold to any side-load forces or impacts.
Do not place a FramePro on the deck of a scissor-lift or any other type of access equipment in order to gain additional standing
height.
Guardrails must be used at working platform heights of 6 ft. or higher.
(Refer to OSHA 1910.28, 1910.29, and ANSI A10.8) Check with state and local codes and regulations for variance from federal
standards.
Before units are to be stacked, a set of four (4 ) Outriggers ( PN MFS-NOR , MFS-WOR )
Must be installed on the base section of scaffolding. Insert casters form a section of scaffolding to be stacked into the outriggers prior
to installation. Do not stack more than three (3) sections high (18 ft./ 5.5 m). Once the scaffold is in the desired position on the jobsite
floor, lock the casters on the scaffold tower and all four outriggers.
All lock pins must be engaged before using scaffold. Lock nut screws onto threaded nipple after scaffold assembly and platform height
adjustment. DO NOT HAMMER LOCK PINS. If locks stick, clean and grease lightly. Move back and forth to free movement.
CAUTION
-The truss channels within which the platforms are secured in place, should be inspected prior to use. Any debris, accumulation of
drywall mud, etc. must be removed prior to use. After placing the platform within the truss channels, always inspect to see that the
platform is properly seated into place.