User's Manual Part 1

80-J7615-1 Rev. A MAY CONTAIN U.S. AND INTERNATIONAL EXPORT CONTROLLED INFORMATION 6-5
Installing the TT210 Terminal on Plate Nose Trailers Installation
3. Carefully ascend the scaffolding to where the terminal will be installed and place it as
high up as is practical between the vertical support rails in the 7-way bay. Make sure it’s
at least .50 inch from the top rivet line.
4. Mount the unit in the 7-way bay using the six rivets. These should be installed top, top,
middle, middle, bottom, bottom.
a. Drill a 3/16" hole then attach the first rivet.
b. Level by measuring down from the top rail.
c. Drill another hole and attach the second rivet, then do the same for the rest of
rivets.
d. Remove battery/connector cover using a #1 Phillips screwdriver.
5. Remove the 7-way receptacle cover from outside the trailer.
DRAFT