User's Manual

80-J7615-1 Rev. A MAY CONTAIN U.S. AND INTERNATIONAL EXPORT CONTROLLED INFORMATION 8-13
Installing the TT210 Terminal on Reefers System Verification and Final Steps
For pre-2010 Thermo King reefers, use cable # 45-J7857-6. For 2010 or newer, use cable #
45-JB082-6.
9. Route the reefer data cable so it is secure to prevent it from being damaged.
10. Connect the TT210 battery to the mating TT210 terminal connector.
11. Connect to the TT210 unit with the 6-pin square Deutsch connector on the reefer
interface cable.
12. Connect to the reefer unit with the 6-pin circular or rectangular Deutsch connector on
the reefer interface cable.
13. Connect the reefer power (ORN) wire with the 8FC (switched external lights circuit)
wire. This wire can be found in the main wire bundle and has a 1/4" male spade
connector. You can either use a female spade or a butt splice.
Note
Reefer power must be connected to a circuit that only has voltage when the reefer is
turned on. For Thermo King reefers, the wire labeled 8FC is recommended.
14. For cable 45-J7857-6, connect the ground (BLU) wire to the ground bus bar behind the
battery. Cable 45-JB082-6 does not have an external ground connection.
15. Verify all mechanical and electrical components are properly connected.
16. Secure the TT210 power/accessory cable along its route using P clamps. Ensure the
cable is held firmly in place.
System Verification and Final Steps
1. Use the Configuration Tool software on a laptop/netbook to configure the terminal and
perform a system verification.
The config tool running on a laptop/netbook uses a Bluetooth connection to
communicate with the TT210 terminal. Refer to Chapter 15: Performing System
Verification for more information. figure like 06aaa_135a
07AAA_102
DRAFT