Installing the TT210 Terminal on Dry Vans Installation
2. Position a portable scaffold in front of the trailer nose where the terminal will be
installed.
3. Carefully ascend the scaffolding to where the terminal will be installed and place it as
high up as is practical between the vertical support rails in the 7-way bay. Make sure it’s
at least .50 inch from the top rivet line. ???
4. Mark the position of the 7/8” hole for the cable then drill both hole.
5. Remove the top plywood cargo liner on the inside.
6. Run the cable from inside.
7. Install grommets. Insert the grommet in the 7/8” hole around the cable part where the
connector ubing stops.
8. Connect the 7-way cable.
9. drawing showing placing unit over grommet. ???
Make sure the unit is riveted tightly
against the trailer skin and there is no gap.