User's Manual

80-J7615-1 Rev. A MAY CONTAIN U.S. AND INTERNATIONAL EXPORT CONTROLLED INFORMATION 4-5
TT210 Installation Planning Tools and Supplies Needed for Installation
1. Identify the installation location.
2. Mount the unit.
3. Route and connect cables and wires.
4. Identify which cargo sensor mount to use.
If 3” from the skin to liner, use internal mount
if > 3” from skin to liner, use 1” pan
if container or plate note use the 3” pan
5. Install the optional cargo sensor and/or door sensor if desired.
6. Install battery into unit.
7. Close the unit.
8. Use the configuration tool software to configure the TT210 system and to verify the
system is working properly. The software is also used to diagnose any problems with
the system.
9. Perform system verification.
Tools and Supplies Needed for Installation
The following tools and supplies are recommended for performing installations.
Laptop with XP or higher for running the Configuration Tool software
Pop-rivet gun (suitable for use with 1/4" rivets)
Wire crimper/stripper/cutter
Felt-tip pen (or grease pencil, or scratch awl)
7/16" deep socket and ratchet
1/2" deep socket and ratchet
3/8" nut driver or socket and ratchet
Metal cutting shear
Assorted 7-way receptacle tools
20-foot portable scaffold or 20-foot ladder
Cable anchors/tie wraps
Drill (battery only recommended)
3/8" drill bit
3/16" drill bit
Assorted drill bits
DRAFT