User's Manual
80-J7615-1 Rev. A MAY CONTAIN U.S. AND INTERNATIONAL EXPORT CONTROLLED INFORMATION 4-5
TT210 Installation Planning Tools and Supplies Needed for Installation
1. Identify the installation location.
2. Mount the unit.
3. Route and connect cables and wires.
4. Identify which cargo sensor mount to use.
• If 3” from the skin to liner, use internal mount
• if > 3” from skin to liner, use 1” pan
• if container or plate note use the 3” pan
5. Install the optional cargo sensor and/or door sensor if desired.
6. Install battery into unit.
7. Close the unit.
8. Use the configuration tool software to configure the TT210 system and to verify the
system is working properly. The software is also used to diagnose any problems with
the system.
9. Perform system verification.
Tools and Supplies Needed for Installation
The following tools and supplies are recommended for performing installations.
• Laptop with XP or higher for running the Configuration Tool software
• Pop-rivet gun (suitable for use with 1/4" rivets)
• Wire crimper/stripper/cutter
• Felt-tip pen (or grease pencil, or scratch awl)
• 7/16" deep socket and ratchet
• 1/2" deep socket and ratchet
• 3/8" nut driver or socket and ratchet
• Metal cutting shear
• Assorted 7-way receptacle tools
• 20-foot portable scaffold or 20-foot ladder
• Cable anchors/tie wraps
• Drill (battery only recommended)
• 3/8" drill bit
• 3/16" drill bit
• Assorted drill bits
DRAFT