Installation manual
Quadra-Fire • SAPH-MBK-IPI, SAPH-D-PMH-IPI, SAPH-D-MBK-IPI, SAPH-D-CSB-IPI Installation Manual • 2343-980_R8 • 11/1445
B. Wiring Requirements
Intellire™ Plus Ignition System Wiring
WARNING! Risk of Shock or Explosion! DO NOT wire
IPI controlled appliance junction box to a switched circuit.
Incorrect wiring will override IPI safety lockout.
NOTICE: Batteries should only be used as a power source
in the event of an emergency power outage. Batteries should
not be used as a primary long-term power source. Battery
polarity must be correct when installing batteries.
Do not store batteries in the battery pack when the
Figure 8.1 IPI Wiring Diagram
TO JUNCTION
BOX (110V)
MODULE
FLAME
SENSE
IGNITER
RC100 RC200 RC300
(OPTIONAL WALL CONTROLS)
GROUND
ORANGE
(PILOT)
GREEN
(MAIN)
BROWN
BLACK
RED
BATTERY PACK
6V DC
FLAME
MODULATION
BLACK
BLACK
RED
BROWN










