Installation manual
Quadra-Fire • SAPH-MBK-IPI, SAPH-D-PMH-IPI, SAPH-D-MBK-IPI, SAPH-D-CSB-IPI Installation Manual • 2343-980_R8 • 11/1437
B. Assemble Slip Sections
Pilot hole
Figure 7.4 Screws into Slip Section
NOTICE: If slip section is too long, the inner and outer ues
of the slip section can be cut to the desired length.
• Apply a bead of silicone sealant (300º F minimum
continuous exposure rating) inside the female outer pipe
joint prior to joining sections.
• Only outer pipes are sealed, sealing the inner ue is not
required.
• All unit collar, pipe, slip section, elbow and cap outer ues
shall be sealed.
Figure 7.3 Slip Section Pilot Holes










