Installation manual

Quadra-Fire • SAPH-MBK-IPI, SAPH-D-PMH-IPI, SAPH-D-MBK-IPI, SAPH-D-CSB-IPI Installation Manual • 2343-980_R8 • 11/1422
Figure 4.17
Three Elbows
INSTALLED
HORIZONTALLY
H
3
H
1
H
2
V
1
3 Elbows to Max. Horizontal
V
1
Minimum H
1
Minimum H
1
Maximum H
total
 610 mm  152 mm  357 mm  914 mm
   152 mm  357 mm  
   152 mm  357 mm  
   152 mm  357 mm  
   152 mm  357 mm  
   152 mm  357 mm  
   152 mm  357 mm  
   152 mm  357 mm  
   152 mm  357 mm  457 mm
Note:
