Installation manual

Quadra-Fire • SAPH-MBK-IPI, SAPH-D-PMH-IPI, SAPH-D-MBK-IPI, SAPH-D-CSB-IPI Installation Manual • 2343-980_R8 • 11/1418
Figure 4.12
Two Elbows
H
1
V
1
V
2
2 Elbows to Max. Horizontal
V
1
Minimum V
1
+ V
2
Maximum H
1
Maximum
 610 mm    
     
     
     
     
     
     
     
     
     787 mm