Installation manual

Quadra-Fire • SAPH-MBK-IPI, SAPH-D-PMH-IPI, SAPH-D-MBK-IPI, SAPH-D-CSB-IPI Installation Manual • 2343-980_R8 • 11/1415
Two Elbows
INSTALLED
HORIZONTALLY
H
1
H
2
V
1
2 Elbows to Max. Horizontal
V
1
Minimum H
1
+ H
2
Maximum
 610 mm  
   
   
   
   
   
   
   
   
   787 mm
   533 mm
Figure 4.9