Installation manual

10 7036-188C June 19, 2014
MT VERNON AE INSERT
Mark area of
floor to cut
Starter hole
Use 2 x 4 from insert
packaging to support insert
Keep sharp edge of
metal floor away from
power cord
Leveling Leg
G. Removing Metal Floor of Factory-Built
Firebox
• The rebrick (refractory), glass doors, screen rails,
screen mesh and log grates can be removed from a fac-
tory-built rebox in order to gain minimum insert open-
ing requirements.
Any smoke shelves, shields and baf es may be removed
from a factory-built rebox if attached with mechanical
fasteners.
• The metal oor of the factory-built rebox may be
removed to facilitate the installation of the insert only
when a 1/4 inch (6mm) airspace is provided between
the insert and the oor of outer wrap.
The following is only one example as there are many differ-
ent models of factory-built replaces.
Figure 10.1. Measure and mark the metal
oor for cutting. With a drill, make a starter
hole in each corner.
Figure 10.2. Using a saws-all, cut out the
oor.
Figure 10.3. If the oor is made of thin metal,
we recommend using the 2 x 4 from the insert
packaging to support the insert. The 2 x 4
may need to be cut to the appropriate size.
Figure 10.4. Place the insert into the facto-
ry-built rebox. Ensure that the power cord
can not be damaged by the sharp metal
edge. You may need to cut out a notch to
accommodate the cord.
Figure 10.5. Ensure that the leveling leg is
positioned over the 2 x 4 before leveling the
insert.