User manual

User Manual – Hazer HZ-2 160.450UK
4
4. Setup :
1. Unpack the haze machine
2. Unscrew the top cap of the tank and remove to fill with the
recommended haze fluid
3. Replace the bottle and screw the cap securely ensuring the pipe is
fed down to the bottom of the bottle so a consistent flow of fluid is
supplied to the machine
4. Connect the remote control
5. Connect the IEC mains plug and power up
6. Heat up time is usually between 3-6 minutes. Please ensure no
button is pressed during the heat up time. When the machine is
ready the LED light on the machine and remote control will
illuminate
7. Press the button on the remote control for 5 seconds so the fluid has
a chance to flow through the heater block making it ready to use..
8. After this you will be able to use the haze machine. It is
recommended to produce haze with small pauses in between so that
the temperature is maintained and the thermostat doesn’t switch
off.
User Manual – Hazer HZ-2 160.450UK
9
11. Timer controller:
1) Timer on/off button
2) Continuous output
3) Manual override button
4) Timer LED indicator (Illuminated Yellow when timer active)
5) Manual ready indicator (Illuminates Green when ready)
6) Power indicator (Illuminates red when power is on)
7) Adjust the amount of Haze released (between 0 – 100%)
NOTE: The below controls are only used when in timer mode
8) Adjust the interval gap between each release of Haze (between
0 – 30 Min approximately)
9) Adjust the duration the Haze / Haze is released at each interval
(between 0 – 15 seconds approximately)
For best results select “continuous” and adjust output to achieve
desired effect, note it can take around 30 seconds for the machine
to produce the correct output.