Product guide

Chapter 5: Technician Maintenance QSSC-S4R Server System Product Guide
Version 1.0
114
6. Push the operator panel module out of the chassis.
Figure 118. Removing the Operator Panel
Installing the Operator Panel
1. Insert the operator panel into the retention guides taking care of that the cable is inserted through the
chassis as shown in the following image.
2. Connect the operator panel cable.
3. Install the fan cage
4. Install all fans
5. Install all memory dividers and memory risers
6. Install the top cover.