User manual
8
Mounting the Mounting Bracket to a 2-Gang Electrical Box - New Construction
The new-construction, 2-gang box should be installed in the wall, during
construction, with the PoE enabled Q-LAN Ethernet cable pre-wired.
Refer to Figure 2.
1. Place the Mounting Bracket on the wall aligning the holes in the Mounting
Bracket (2) with the holes in the 2-gang box (1).
2. Use four Mounting Bracket Screws (3) and an appropriate screwdriver to
secure the Mounting Bracket to the 2-gang box.
3. Follow the steps in Mounting the TSC-3 to the Mounting Bracket on
page 8.
Mounting the TSC-3 to the Mounting Bracket
Refer to Figure 3.
IMPORTANT: The Mounting Bracket (1) must be secured
to the wall by one of the four methods found in the sections
"Mounting the Mounting Bracket to a 2-Gang Electrical Box -
New Construction" on page 8, "Mounting the Mounting
Bracket to 5/8" Drywall" on page 11, "Mounting
the Mounting Bracket to a 2-Gang Electrical Box - Old
Construction" on page 9 or "Mounting the Mounting
Bracket to a 2-Gang Electrical Box - New Construction" on page 8.
1. Plug the Q-LAN Ethernet cable (2), into the RJ45 socket (3) on the back of
the TSC-3.
2. Carefully angle the top of the TSC-3 forward (towards the wall), and slide the
TSC-3 onto the Mounting Bracket (1) inserting the two mounting tabs (4)
into the mounting tab receptacles (5). Make sure the cable is fed carefully
into the box or wall and is not binding anywhere.
3. After engaging the tabs, straighten the TSC-3, pull slightly down, and push
in on the bottom to snap the latching bumps (6) into the Mounting Bracket
detents (7).
4. Secure the TSC-3 to the Mounting Bracket with two Security Screws (8)
inserted in the two outer holes (9) in the TSC-3 bezel.
To remove the TSC-3 from its mounting, remove the two Security Screws, and
insert a small flat blade screwdriver in the slot in the bottom of the bezel, then
gently twist to release the detent latching.
— Figure 2 —
1
2
3
— Figure 3 —
4
5
8
3
1
7
6
2
9