User manual
7
Unpacking
There are no special unpacking precautions. However, it is recommended that you keep the original packing materials for reuse in the rare event that
service is required. If service is required and the original packing material is not available, ensure that the unit is adequately protected for shipment
(use a strong box of appropriate size, sufficient packing/padding material to prevent load shifting or impact damage) or call QSC’s Technical Services
Group for replacement packing material and a carton.
TSC-3 Touchscreen Packing List
Part Name Qty Description
TSC-3-WH or TSC-3-BK Touchscreen 1
Surface-Mount Back Box 1
Mounting Bracket 1
Drywall Clamps 2
Drywall Clamp screws 4 #8 x 1.25"
Security screws 2 #4-40, 0.25"
Mounting Bracket screws 4 #8-18, 0.375"
Tie-wrap 1 4"
Q-Sys Hardware User Manual - TSC-3 1 TD-000343-00
Installation
The Q-Sys TSC-3 can be mounted in one of four ways:
• flush mount using a 2-gang electrical box new construction and old-construction
• surface mounted with the Surface Mount Back Box
• stand-alone flush mount
Regardless of the option you use, the TSC-3 touchscreen itself is always mounted to the Mounting Bracket, the four options facilitate installing the
Mounting Bracket to the wall or other mounting surface. The following instructions cover all three installation options.
General Requirements
The TSC-3
• must have access to a PoE enabled Q-LAN Ethernet connection (RJ45)
• must be mounted with sufficient space for adequate ventilation and installation
• must be mounted in a wall no less than 2.38” (60.5 mm) deep
• should be mounted in a location where it will not be an obstruction to normal traffic