Please comply with all warnings and operating instructions described in this manual and read all the precautions before installing. Before operating this product, be sure to review all safety and operational instructions. contents 1-1. Transport and storage 1 1-2. Preparation 1-3. Installation 1-4. Operation 1-5. Standards applied 2. installation eee 2 2.1. Unpacking and inspection = = = 2-2. Back plane view 2.3, Main Unit installation = 2-4. Software installation = J. Usingoperaion mess eee eee 6 3-1.
1. Safety instruction Please read the manual and safety instructions before installing and using this product. 1-1. Transport and storage When you need fo cant the UPS system, be sure to use the original packaging material A ent and mitigates accidental shove, A The place of UPS product Is stored must be dry and well ventilated. 1-2. Preparation When the UPS system ls moved to the Indoor warm environment directly from the cold environment, There may scour condensation.
2-2. Back plane view Computer Interface @ Smart slot @ Fan @ Parallel port cover plats (Combination card Is optional) @ Input protection switch Maintain switch cover maintainable switch ls optional, Professional version has been Installed) @ Terminal block cover plate ® Beam line frame @ EPO (only for Professional version) 2-3.
Please pay attention to battery voltage marked on backboard. UPS may be damaged and unrepeatable if wrong battery voltage connected. So please make sure battery voltage most UPS standard. © Lassa note to distinguish the nods and cathode marked an lexical battery tenpin, to ensure they are compactly connects, or wil causing LPS damage and unrepeatable.
Function 3-3.
3-4. Main unit operation 1. Start Under Man Supply Mode 1) Confirm the system wiring and long-run machine battery cabinet voltage is right connected, then switch battery cabinet breaker to (this operation only adapts to long-run machine) 2) Switch mail supply breaker to , then the inner power of UPS will auto-started, fan rotating, UPS entering initialize mods. With seconds later, UPS will un in bypass mode and output.
12. Battery Unit Number Alteration ( apply to related machines } 1) This stop can orally operated by professional electricians. 2) Shut down UPS before operating. 3) Break the Input breaker first and then break battery breaker. 4) Take off the cover and adjust the needle (CN1) to set battery unit number. 5) Please set battery ult number carefully and put back the cover. 6) Close battery breaker then close Input breaker, UPS will access to bypass made then.
® 01: Output voltage Anal Display Setup 2go0™ = Parameter 3: output voltage ‘You can choose the following output voltage In parameter 3: 208: default output voltage is 2080s 220: default cutout voltage 230: default output voltage Sven 240: default output voltage is 240Vac @® 02: Output frequency Panel Display Setup 60Hz, CFC Mode 500. CF RI 50HZ: Normal Mode 500. (GF bee, REQ 500. Parameter 2: output frequency Setup the output frequency.
@® 18: Max. charging current setup Panel Display Setup 40 18 Parameter 3; Max. charging current adjusting. Long-run machine's default value ls 4A, setup range i5 standard machine's default values is 1A, E31 &\ | | setup range is as Nita: Any adjusting must comply wih tha battery ‘specification requires.
3-9.