User manual
57
3.6 Power Management
You can restart or shut down the NAS, specify the behaviour of the NAS after a power recovery, and
set the schedule for automatic system power on/ off/ restart on this page.
Restart/ Shutdown
Restart or shut down the NAS immediately.
If you try to restart or turn off the NAS from the web-based interface or the LCD panel when a
remote replication job is in process, the NAS will prompt you to ignore the running replication job or
not.
Turn on the option ‘Postpone the restart/shutdown schedule when replication job is in process’ to
allow the scheduled system restart or shutdown to be carried out after a running replication job
completes. Otherwise, the NAS will ignore the running replication job and execute scheduled system
restart or shutdown.
Wake on LAN
Turn on this option to allow the users to power on the NAS remotely by Wake on LAN. Note that if
the power connection is physically removed (in other words, the power cable is unplugged) when the
NAS is turned off, Wake on LAN will not function whether or not the power supply is reconnected
afterwards.
This feature is not supported by TS-110, TS-119, TS-210, TS-219, TS-219P, TS-410, TS-419P, TS-
410U, and TS-419U.
Power resumption settings
Configure the NAS to resume to the previous power-on or power-off status, turn on or remain off
when the AC power resumes after a power outage.