Setup guide

"$.#
-















d Secure the SCSI interface card to the interface panel with the
two larger screws in the kit.
8 Reinstall the controller board panel on the printer.
9 Tighten the two screws.
10 Push the fuser unit back in.
11 Close the printers front cover.
12 Reconnect all interface cables.
13 Reconnect the power cord and turn on the printer.
»Note:
In compliance with UL guidelines, “The appliance inlet is
considered to be the main disconnect device.”
14 Print a startup page.
Check that the startup page lists the interface just installed
under “Options.”
,//'3
The Y2K-compliant time-of-day clock provides time and date informa-
tion on the startup page and in the accounting data.
!"$%
The optional time-of-day clock kit includes only the following:
Time-of-day clock

Caution:
It's very important to protect the printer controller board and
any associated circuit boards from electrostatic damage. Before
performing this procedure, review the antistatic caution in “Antistatic
Protection” on page 3-2. In addition, always handle circuit boards by
the edges only.
EDNord - Istedgade 37A - 9000 Aalborg - telefon 96333500