Installation guide

2 – Installation
Installation Tasks
2-4 D000024-000 Rev. A
Q
The IB cables can be accessed easily.
Water or moisture cannot enter the switch.
The ambient temperature stays between 50° - 113°F (5° - 45° C).
Cabinet doors do not interfere with front-to-back air flow.
The cabinet should have its own switchable power distribution. If the switch has two
power supplies, it is suggested that a cabinet with dual power distribution units is
used.
It is recommended that cabinet anti-tip devices are used. This is especially true if
installing or removing a switch in the upper half of the cabinet when the lower half
is empty.
2.3
Installation Tasks
The following is an overview of the installation tasks detailed in this section:
1. If applicable, remove the doors of the rack.
2. Mark the rack, allowing the applicable amount of vertical space to install each
switch.
3. Install the hat rail sections (9024, 9020 and 9040).
4. Install the bottom support rails (9024, 9020, 9040, 9080, 9120 and 9240).
5. Rack mount the switch.
6. Install the top support rails (9240).
7. If applicable, replace the rack’s doors.
NOTE: The mounting kit hardware contains all of the necessary parts for installing
and mounting the switches into a rack. These kits are intended for use in
cabinets with a depth ranging from 28 - 34 inches. A support shelf capable
of supporting the rated weight of the 9240 may be used in place of rails.
For specific product weights refer to Table A-1 in Appendix A.
2.3.1
Mounting Hardware Kit Contents:
2.3.1.1
9024-FC
Kit Mounting Brackets containing:
One pair (left and right) of rack mounting brackets
#6-32 flat head screws