Installation guide

2 – Installation
Installation Tasks
D000024-001 Rev. B 2-31
A
DDR (Spine Module Only):
Green indicates that the switch is capable of running at DDR speeds.
Off indicates that the switch is not capable of running at DDR speeds (i.e.,
SDR only).
Subnet Manager License Key Activation
If the user has purchased the InfiniBand Fabric Suite 2008 package, in order to
activate the subnet manager the user must acquire a subnet manager (SM) license
key from QLogic Technical Support. In order to do this, the user must first find the
globally unique identifier (GUID) for the FRU to be used as the master SM. The
GUID can be:
Retrieved from the label on the spine.
Retrieved via software using the Chassis Viewer GUI or the command line
interface (CLI).
For detailed information on retrieving the FRU GUID and acquiring a license key,
please refer to the applicable switch quick start guide.
Shut Down Procedures
In order to shut down the switch:
1. Power down the switch by removing the power cords from the AC power inlets.
Hot Swapping Components
Hot Swapping Leaf/VIO and Spine Modules
NOTE: Following are the general guidelines for hot swapping leaf and spine
modules:
Hot swap one module at a time, allowing the chassis to completely update it
before hot-swapping the next module. The module update is complete when it
becomes visible within the Chassis Viewer GUI. Listed below are the
approximate times to fully update each module type:
Spines modules: up to 4 minutes
Leaf/VIO modules: up to 2 minutes
A general recommendation is to hot swap beginning with leaf modules, then VIO
cards, then spine modules with the managed spine(s) being last.
When a management spine is hot swapped, the rest of the chassis will continue
to move packets without interruption.