Installation guide

2 – Installation
Installation Tasks
2-8 D000024-001 Rev. B
S
Four Post Standard-Depth Rack
1. Install the hat rails on each side of a switch (from a port side) using two (2)
#6-32 screws per rail. Note that the hat rails are marked Right and Left.
Figure 2-3 9024 Standard Hat Rails
2. Install eight (8) cage nuts into rack posts. Two (2) cage nuts per post. Install
the rack rails and fasten to cage nuts using six (6) rack mount screws. Leave
2 cage nut locations open.
NOTE:This end of rail is installed where the equipment end (i.e., port side) of
a switch will be installed.