Installation guide

2 – Installation
Installation Tasks Checklist
D000024-001 Rev. B 2-3
A
The longest potential time period the UPS might be required to supply backup
power.
Whether or not the UPS unit also provides online protection.
Installation Tasks Checklist
To perform the actual switch installation, the site implementation engineer must
perform the following tasks, which are detailed in this section.
CAUTION!
Be sure to review the safety information before starting the installation and
during the installation process (refer to Appendix B).
1. Check the installation site to verify the installation of cabinet power feeds, rails,
and grounding.
2. Unpack the equipment and inspect for any shipping damage. Any shipping
damage should be reported to the shipping company.
3. Verify that the equipment shipped matches the packing list.
4. Mark the rack and install the mounting rails.
5. Physically install the switch in the rack.
Tools and Equipment Required
An ESD wrist strap
A #2 Phillips screwdriver
Pen (felt-tip) to mark the mounting holes
Check the Installation Site
The switches are designed to be installed in an existing server cabinet (not a telco
cabinet), where it can be mounted in a standard equipment rack.
Be sure of the following:
The cabinet has a full earth ground to provide reliable grounding.
There is enough room to work on the equipment.
The equipment will have enough clearance for front and rear access.
The IB cables can be accessed easily.
Water or moisture cannot enter the switch.
The ambient temperature stays between
50° - 113°F (5° - 45° C).
Cabinet doors do not interfere with front-to-back air flow.