User`s manual
Table Of Contents
- Preface
- General Description
- Installation
- Introduction
- Unpack
- Place or Mount the Equipment
- Apply the IEC Class 1 Laser Information Label (If the installation is in Europe)
- Install GBICs
- Connect to AC Power
- Switch Logic Power Good LED
- Check the Power-On-Self-Test (POST) Results
- Cable Fibre Channel Devices to the Switch
- Configure the Chassis
- Configure the Ports
- Zoning
- Rack and Shelf Administration
- Operating the Switch
- Diagnostics/Troubleshooting
- Removal/Replacement Procedures
- Multi-Chassis Fabrics
- Reference Information
- QLogic Customer Support
- Index

Preliminary
Front Panel Controls
SANbox-8 Fibre Channel Switch
Installer’s/User’s Manual 59008-03 Rev. A General Description 1-19
Front Panel Controls
Power Switch
Figure 1-5 shows the location of the Power Switch. The Power switch is a rocker
switch (press the Right side (labeled 1) to turn it ON, press the Left side (labeled 0)
to turn it OFF).
When you press the Power switch and turn it ON, there is a two-second delay
before the fans start and the Power Good LED on the front of the chassis lights.
The Power Good light indicates that the Switch logic is receiving power within the
proper voltage range.
Test Mode Switch
The Test Mode Switch on the front panel is for use only under the direction of
QLogic Customer Support or your authorized maintenance provider. This switch is
a rotary switch and must be in the position shown in Figure 1-7 for normal opera-
tion. Note that the small dot on the end of the shaft is straight UP.
Figure 1-7 Test Mode Switch
6
7
8
Test Mode
Switch