User`s manual
Table Of Contents
- Preface
- General Description
- Installation
- Introduction
- Unpack
- Place or Mount the Equipment
- Apply the IEC Class 1 Laser Information Label (If the installation is in Europe)
- Install GBICs
- Connect to AC Power
- Switch Logic Power Good LED
- Check the Power-On-Self-Test (POST) Results
- Cable Fibre Channel Devices to the Switch
- Configure the Chassis
- Configure the Ports
- Zoning
- Rack and Shelf Administration
- Operating the Switch
- Diagnostics/Troubleshooting
- Removal/Replacement Procedures
- Multi-Chassis Fabrics
- Reference Information
- QLogic Customer Support
- Index

Preliminary
Place or Mount the Equipment
SANbox-16STD Fibre Channel Switch
2-4 Installation 59012-03 Rev. A Installer’s/User’s Manual
2. Place the Switch in a 19” EIA rack and secure it with eight (8) 10-32
machine screws (not supplied). If the vertical space is sufficient, you may
leave the rubber feet on the Switch chassis. If the vertical space is not suffi-
cient, you may remove the rubber feet by turning them counterclockwise by
hand (or with a flat-blade screwdriver).
Figure 2-1 Cabinet Mounting Bracket