User`s manual

Table Of Contents
Preliminary
SANbox-16STD Fibre Channel Switch
Installer’s/User’s Manual 59012-03 Rev. A Installation 2-1
Section 2 Installation
Introduction
There are nine basic steps required to install the Switch.
1. Unpack
2. Place or Mount the Equipment
3. Apply the IEC Laser Safety Label (If the installation contains fiber optic
GBICs and is in Europe)
4. Install the GBICs
5. Connect the Switch to AC power
6. Check the Power-On-Self-Test (POST) results
7. Cable Fibre Channel Devices to the Switch
8. Configure the chassis
9. Configure the ports