User`s manual
Table Of Contents
- Preface
- General Description
- Installation
- Introduction
- Unpack
- Place or Mount the Equipment
- Apply the IEC Class 1 Laser Information Label (If the installation is in Europe)
- Install GBICs
- Connect to AC Power
- Switch Logic Power Good LED
- Check the Power-On-Self-Test (POST) Results
- Cable Fibre Channel Devices to the Switch
- Configure the Chassis
- Configure the Ports
- Zoning
- Rack and Shelf Administration
- Operating the Switch
- Diagnostics/Troubleshooting
- Removal/Replacement Procedures
- Multi-Chassis Fabrics
- Reference Information
- QLogic Customer Support
- Index

Preliminary
AC Input Power Connector and Fuses
SANbox-16STD Fibre Channel Switch
1-22 General Description 59012-03 Rev. A Installer’s/User’s Manual
AC Input Power Connector and Fuses
Refer to Figure 1-5. A standard 3-wire computer-type AC power cable (supplied
with the Switch) connects between the AC Input Power Connector and an AC
outlet. Refer to Appendix A Reference Information for the AC Power Require-
ments. See also Section 2 Installation for installation procedures.
An Input Fuse Holder is incorporated into the AC Input Power Connector
assembly. It holds two input fuses. Refer to “Input Fuse” on page 4-1 for fuse
removal and replacement procedures and to “Switch Electrical” on page A-4 for
fuse size.
Switch Management Connector
Refer to Figure 1-5. The Switch Management Connector is a 10/100BASE-T
Ethernet interface that provides a connection to a management station. Refer to the
Switch Management manual for information about how to connect the manage-
ment station and manage the Switch.