User`s manual
Table Of Contents
- Preface
- General Description
- Installation
- Introduction
- Unpack
- Place or Mount the Equipment
- Apply the IEC Class 1 Laser Information Label (If the installation is in Europe)
- Install GBICs
- Connect to AC Power
- Switch Logic Power Good LED
- Check the Power-On-Self-Test (POST) Results
- Cable Fibre Channel Devices to the Switch
- Configure the Chassis
- Configure the Ports
- Zoning
- Rack and Shelf Administration
- Operating the Switch
- Diagnostics/Troubleshooting
- Removal/Replacement Procedures
- Multi-Chassis Fabrics
- Reference Information
- QLogic Customer Support
- Index

Preliminary
SANbox-16HA Fibre Channel Switch
Installer’s/User’s Manual 59005-03 Rev. A Removal/Replacement Procedures 4-1
Section 4 Removal/Replacement Procedures
Introduction
The only Field Replaceable Units (FRUs) in the Switch are the Input Fuses,
GBICs, and the Power Supply(s).
Input Fuse
Removal
1. Turn OFF the Power Switch.
2. Unplug the AC Power Cable from the appropriate AC Power Plug Assembly.
3. Refer to Figure 4-1. Insert a thin-blade screwdriver into the slot behind the
tab and use it to pull the Fuse Holder out the front of the AC Power Plug
Assembly.
4. Pull the Fuse from the Fuse Holder.
Figure 4-1 Fuse Holder Removal
AC Power Plug
Assembly
Fuse Holder
Tab
Slot