User`s manual
Table Of Contents
- Preface
- General Description
- Installation
- Introduction
- Unpack
- Place or Mount the Equipment
- Apply the IEC Class 1 Laser Information Label (If the installation is in Europe)
- Install GBICs
- Connect to AC Power
- Switch Logic Power Good LED
- Check the Power-On-Self-Test (POST) Results
- Cable Fibre Channel Devices to the Switch
- Configure the Chassis
- Configure the Ports
- Zoning
- Rack and Shelf Administration
- Operating the Switch
- Diagnostics/Troubleshooting
- Removal/Replacement Procedures
- Multi-Chassis Fabrics
- Reference Information
- QLogic Customer Support
- Index

Preliminary
SANbox-16HA Fibre Channel Switch
Installer’s/User’s Manual 59005-03 Rev. A
v
TL_Ports 2-19
T_Ports 2-19
Tuning Ports for Multi-Frame Sequences 2-20
Zoning 2-21
Rack and Shelf Administration 2-22
Operating the Switch 2-22
3
Diagnostics/Troubleshooting
Introduction 3-1
Power Supply Troubleshooting 3-2
Power-On-Self-Test (POST) 3-6
Overview 3-6
Heartbeat LED Blink Patterns 3-8
Test/Failure Descriptions 3-8
Cable Continuity Tests 3-12
4
Removal/Replacement Procedures
Introduction 4-1
Input Fuse 4-1
Removal 4-1
Replacement 4-2
GBIC 4-3
Removal 4-3
Replacement 4-4
Power Supply 4-6
Removal 4-6
Replacement 4-7
Battery 4-7
5
Multi-Chassis Fabrics
Introduction 5-1
Three Multi-Chassis Topologies 5-2
Choosing a Topology 5-3
Cascade Topology 5-5
Cascade Fabric Size 5-6
Cascade Latency 5-6
Cascade Bandwidth 5-7
Cascade Physical Distance between Chassis 5-7
Cascade Zoning 5-8
MKII Compatibility 5-8
Mesh Topology 5-9
Mesh Fabric Size 5-9