User`s manual
Table Of Contents
- Preface
- General Description
- Installation
- Introduction
- Unpack
- Place or Mount the Equipment
- Apply the IEC Class 1 Laser Information Label (If the installation is in Europe)
- Install GBICs
- Connect to AC Power
- Switch Logic Power Good LED
- Check the Power-On-Self-Test (POST) Results
- Cable Fibre Channel Devices to the Switch
- Configure the Chassis
- Configure the Ports
- Zoning
- Rack and Shelf Administration
- Operating the Switch
- Diagnostics/Troubleshooting
- Removal/Replacement Procedures
- Multi-Chassis Fabrics
- Reference Information
- QLogic Customer Support
- Index

Preliminary
Place or Mount the Equipment
SANbox-16HA Fibre Channel Switch
Installer’s/User’s Manual 59005-03 Rev. A Installation 2-3
The following steps describe how to mount the chassis in a rack:
1. Mount the Brackets. The chassis must sit on rails or a shelf in the rack or
cabinet. Refer to Figure 2-1. The Switch is shipped with a package
containing cabinet mounting brackets. The screws are already in the chassis
so you must remove them and reuse them to mount the brackets. Mount these
brackets on either the front or back corners of the chassis.
2. Place the Switch in a 19” EIA rack and secure it with eight (8) 10-32
machine screws (not supplied). If the vertical space is sufficient, you may
leave the rubber feet on the Switch chassis. If the vertical space is not suffi-
cient, you may remove the rubber feet by turning them counterclockwise by
hand (or with a flat-blade screwdriver).
Figure 2-1 Cabinet Mounting Bracket