Installation guide

1–Installation
Bringing Up the System For the First Time
D000140-001 D 1-49
Bringing Up the System For the First Time
12800-Series Management Module Protective Label
Guidelines
A management module installed in a 12800 system may have a protective label
installed, as shown in Figure 1-42. This label protects the mechanical release
latch (MRL) switch inside the management module from shock and vibration
during shipping.
Figure 1-42. MRL Protective Label 1
Staging Area Testing
If a MM requires testing prior to final installation at an end-user site (for example,
testing at a staging area), do the following:
1. Disengage the thumb screw and partially rotate the lever as shown in
Figure 1-43.
Figure 1-43. MRL Protective Label 2
2. Fold back the label from the thumb screw hole. Re-engage the lever and
tighten the thumb screw as shown in Figure 1-44.