Installation guide
1–Installation
12800-120 Installation
1-18 D000140-001 D
3. Install support rails in the rack. Fasten with two (2) M6 screws per EIA rail to
pre-installed clip nuts and torque to 30 in-lb.
Figure 1-14. Support Rail Installation
4. Install two (2) rear mounting Hat Brackets on the chassis and fasten with
#8-32 screws. There are four (4) screws per bracket. Torque to 30in-lb.