Installation guide
1–Installation
12200/12300 Installation
D000140-001 D 1-9
Figure 1-5. 12200 and 12300 Four Post Standard Rack Mounting
12200 Four Post Shallow-Depth Rack Installation
In a shallow-depth rack, the distance between the front and back mounting posts
is ~16" (400mm). Mounting rails for the 12200 are adjustable to accommodate
racks with 14"-20" between mounting posts.
Mounting Hardware Kit Contents:
One pair of C-brackets
One pair of hat rails, left and right
#6-32 screws
M6 cage nuts
M6 screws