Installation guide
1–Installation
Bringing Up the System For the First Time
D000102-000 B 1-35
Figure 1-32 MRL Protective Label 3
3. After testing is complete at the staging area, reverse Steps 1 and 2 to
prepare the system for shipment to the end-user site (see Figure 1-33).
Figure 1-33 MRL Protective Label 4
User Site Installation
After final installation of a 12800-series switch is completed at the end user site:
1. Disengage the thumb screw and partially rotate the lever as shown in
Figure 1-34.
Figure 1-34 MRL Protective Label 5