User`s guide
3–Using DMS
Starting Serial Scheduled Jobs
3-18 ISR654606-00 A
Figure 3-8 Data Migration Jobs Options: Batch
7. To save the data migration job options, click Apply. Or, to abandon changes 
to this data migration job, click Cancel.
Starting Serial Scheduled Jobs
If the individual or batch data migration job you created was configured as a 
Serial Schedule Jobs scheduling type on the Data Migration Jobs Options dialog 
box(Figure 3-5 on page 3-11 or Figure 3-8 on page 3-18), the job is listed on the 
Active Data Migration Jobs page. The Status column shows the job as Serial 
Scheduled.
To start a serial scheduled job:
1. Open the Serial Data Migration Jobs Options dialog box using one of these 
options:
 On the Wizards menu, click Serial Schedule Job(s).
 Right-click a serial scheduled job, and then click Start the Serial 
Schedule. This option immediately starts the selected job, unless 
there are other jobs configured with a lower priority that must complete 
migration first. 
The Serial Data Migration Jobs Options dialog box opens, as shown in 
Figure 3-9.










