User`s guide
3–Using DMS
Using the Data Migration Wizard
ISR654606-00 A 3-17
5. To save your migration job and assign job attributes, click Schedule. Or, to
abandon your changes, click Close.
6. In the Data Migration Jobs Options dialog box (see Figure 3-8), specify the
job attributes as follows:
a. Under Scheduling Type, select one of the following:
Click Start Now to start the job immediately.
Click Schedule for Later, and then enter a Start Time and Start
Date.
Click Serial Schedule Jobs, and then assign a priority (1–256)
in the Job Priority box, where a lower value indicates that the
job is scheduled earlier than jobs configured with higher values.
For details on Serial Schedule Jobs, see “Starting Serial
Scheduled Jobs” on page 3-18.
Click Configure Only to configure the migration job without any
start time or priority. You may start this job at a later time. (To
start the job, select it and then click Start, or from the active job
pane, right-click the job and then click Start.)
b. In the Job Description box, enter a user-defined name to describe
this data migration job.
c. In the Group Name box, select a job group name from the list. The
group name makes it easier to view the job status on a group basis.
d. In the IO Size box, either select one of the default I/O sizes, or enter a
custom value.