Product specifications
ISR654605-00 A A-1
A Checklist Examples
This appendix provides examples of completed data migration checklists. These
examples depict a scenario where a customer is upgrading from an old EMC
CX3-20 storage array to a new HP EVA 4400 storage array. Three applications
and servers are using the CX3-20 array. Each of these three servers has a
different operating system. The information shown with bold text in these tables
represents changes from the existing configuration.
Step 1: List the Source and Destination Storage
Array
Table A-1. Example: Storage Array Information
Storage
Array
Source or
Destination
Firmware
Version
Array
Management
Software
a
a
The storage array specific software that will be used in data migration to present the source LUNs to the MPX200, and
to create destination LUNs to be presented to the MPX200 and to the server. The array management software will
also provide the controller and WWPN information for the storage array ports.
Number
of Con-
trollers
WWPN
b
(Fibre
Channel)
b
World wide port name of the Fibre Channel array; used in performing zoning in Fibre Channel switch firmware.
EMC CX3-20 Source 03.24.040.5.0
06
Navisphere 2 50-06-01-60-41-e0-18-94
50-06-01-61-41-e0-18-94
50-06-01-62-41-e0-18-94
50-06-01-63-41-e0-18-94
HP EVA
4400
Destination
CR0D63xc3
p-6000
Command
View
2 50-00-1F-E1-50-06-22-A1
50-00-1F-E1-50-06-22-A2
50-00-1F-E1-50-06-22-A2
50-00-1F-E1-50-06-22-A3
50-00-1F-E1-50-06-22-A4
Table Notes