Product specifications
3–Performance and Downtime
Minimizing Downtime
3-2 ISR654605-00 A
Before Application Downtime
Before application downtime, follow these steps:
1. Plan the data migration project:
a. Create the migration checklist.
b. Determine if a change in multi-pathing software is required.
c. Build the LUN ID table for both the source and destination array to
establish the LUN ID relationship between the server and the MPX200.
d. Plan to migrate together the LUNs from the same server/cluster.
2. Configure the MPX200 in the SAN: Perform proper zoning such that the
MPX200 can see ports from both the source and destination arrays.
3. Create the LUNs on the destination array:
For the UNIX operating system, use the same size LUNs.
For Windows operating systems, you may create a larger LUN.
Do not present LUNs from the destination array to the server until migration
is complete.
4. Based on the order in which LUNs should be migrated, balance the LUNs
across multiple controllers of the same array.
5. Present the source LUNs and destination LUNs to the MPX200.
6. Using the MPX200 user interface, assign appropriate (source/destination)
attributes to the storage array.
7. Using the MPX200, create user-defined groups to assign the migration jobs
related to the same server in a single group.
8. Using the user interface wizard, configure migration jobs.
During Application Downtime
During application downtime, follow these steps:
1. Confirm with the storage administrator that the application and server are
down, and that the server no longer has access to the storage under
migration.
2. Remove the server access to the source storage array.by changing the Fibre
Channel zoning such that server adapter ports can no longer see the source
or destination array ports.
3. Start the previously configured migration jobs.
4. If required, install the new multi-pathing software on the server.