Installation guide
7–Removal and Replacement
Power and Cooling Modules
ISR651101-00 C 7-13
Figure 7-12 Inserting the Replacement PCM
3. Connect the power cable to the newly inserted PCM. Its status LED should
change from amber to green within 5 seconds.
Figure 7-13 Back Side of Two PCMs, Both With Good Status Indicators
4. Verify that the airflow through both PCMs is in the same direction.
(1)
(2)