Installation guide
3–Installation
Installing the iSR6152 Router
3-4 ISR651103-00 C
Pre-Installation Check List
During the initial configuration process, the system prompts you for the
parameters listed in Table 3-2. Complete this table before installation to expedite
the configuration process.
Mounting the Router
You can place the router on a flat surface or mount it in a standard 19-inch
Electronic Industries Association (EIA) rack. See the product specification for
weight and dimensions. Rack mounting requires a QLogic rack mounting kit (Part
No. ISR614X-RACKKIT). Contact QLogic for more information.
Table 3-2. Pre-Installation Checklist
Item My System
Symbolic name of
iSR6152
Management Port
(MGMT)
IP Address (if not using DHCP):
Subnet Mask (if not using DHCP):
Gateway (if not using DHCP):
GbE Port 1 (GE1)
IP Address:
Subnet Mask:
Gateway:
GbE Port 2 (GE2)
IP Address:
Subnet Mask:
Gateway:
GbE Port 3 (GE3)
IP Address:
Subnet Mask:
Gateway:
GbE Port 4 (GE4)
IP Address:
Subnet Mask:
Gateway: