Installation guide
3–Installation
Installing the iSR6152 Router
3-2 ISR651103-00 C
Power Requirements
Power requirements for the iSR6152 router are 0.5Amps at 100–125 VAC, 50Hz
to 60Hz or 0.25Amps at 200–240 VAC, 50Hz to 60Hz.
Environmental Conditions
Consider the factors that affect the climate in your facility, such as equipment heat
dissipation and ventilation. The router requires the following operating conditions:
Operating temperature range: 5–40
°C (41–104°F)
Relative humidity: 15–90 percent, non-condensing
Installing the iSR6152 Router
This section provides information about installing, configuring, and connecting the
hardware and software, including:
“Pre-Installation Check List” on page 3-4
“Mounting the Router” on page 3-4
“Installing the Transceivers” on page 3-6
“Connecting the Management Workstation to the Router” on page 3-6
“Configuring the Management Workstation” on page 3-6
“Installing Router Manager” on page 3-8
“Starting Router Manager” on page 3-9
“Connecting the Router to AC Power” on page 3-10
“Configuring the Router” on page 3-10
“Cabling Devices to the Router” on page 3-11
Internet browser
One of the following:
Microsoft Internet Explorer 7.0 and later
Safari™
Java 2 runtime environment to support the Web applet
Table 3-1. Management Workstation Requirements (Continued)
Item Description