Operation Manual
42
• Use 6 pcs M6 x 35 mm bolts and nuts to connect the post (7) to the 3 pcs post
brackets (9). Tighten the bolts and nuts.
Step 3: picture 5
Step 4: picture 6, 7, 8
• Secure the 3 pcs 60 mm pins (reflector support bolts) on the cap of flame
screen (2).
• Connect the gas hose (QA1) to the gas connector. (picture 7)
Please note
- The gas hose (QA1) is NOT included with the heater. Hose must be purchased
separately
- Minimum / Maximum length gas hose: 140-160 cm
- Screw connection (France G1/2) is fitted as standard
- Hoses Ø 8-13 mm. can be fitted as well. When required: use the multi coun-
try connector (picture 12) supplied. Fitting of the multi country connector is
described in the separate manual supplied in with the included multi country
kit. When using the multi country connector: ALWAYS make sure to use hose
clamps!
• For gas hose with threaded connectors: bind 2 or more rounds of plumbing
tape around the gas pipe before connecting the gas hose for security.
• Bind 2 or more rounds of Teflon plumbing tape around the gas burner inlet
connector and connect the gas pipe. Use a wrench to tighten the connection.
• Fix the completed burner unit to the post by 4 pcs M6 x10 mm bolts.(picture
8)
Step 5: picture 9, 10
• Carefully take of the blue protection film completely from each reflector
part.
• Assemble reflector following picture 9
• Put Ø 8 mm washer on each reflector support bolt.
• Fix the reflector (1) to the support bolts (picture 10)
• Fasten the reflector (1) with 3 pcs washers and 3 pcs M8 wingnuts.
Step 6: picture 11
• Lift the tank housing (8) and rest it on the post plate (9)
• Connect the other end of your gas hose according to the mounting instruc-
tion as supplied with the gas hose and/or supplied with the gas regulator.
Note:
- The gas hose (QA1) is NOT included with the heater
- The gas regulator is not included with the heater
• Connect the regulator to the gas cylinder (not included) according to the
mounting instruction as supplied together with the gas regulator and/or the
gas cilinder
• Put gas cylinder on the base (10).
OPERATION
TO TURN ON THE HEATER
Check that the regulator seal is correctly fitted and able to fulfil its function.
4
man_PGU2013_('18)_V1.indd 42 10-01-18 14:56