Operation Manual
29
>1800
>1800
>1000
>500
>500
>500
>1800
>500>500
Hanging Installation
• Mark and drill 2 Ø8 holes on the ceiling as per diagram.
• Insert plastic plugs (#1) 2pcs into the holes.
• Screws (#3) 2pcs longer ones go through the mounting pole (#2) and fasten
on the ceiling.
• Insert the hanging lines (#4) 2pcs into the line holes (#A) of mounting pole
(#2). Length can be manually adjusted by pushing the switch of hole (#A).
• Clip the power cord on the cable clip (#B) of mounting pole (#2).
1
2
3
4
B
A
Wall/Ceiling Mounted Installation
• Mark and drill 4 Ø8 holes on the wall or ceiling as per diagram.
• Insert plastic plugs (#1) 4pcs into the holes.
• Screws (#3) 4pcs shorter ones go through the mounting bracket (#2) 1pc and
fasten on the wall or ceiling.
• Parallel insert the bracket (#2) into the sheet (#4), fasten with screw (#5) 1pc.
• Fasten the screw (#A) of the bracket (#2) after adjust the suitable angle for
using the heater.
5
3
2
4
1
A
4