INSTALLATION AND OPERATION MANUAL Q.PEAK DUO ML-G10.
TABLE OF CONTENTS 1 2 3 4 5 6 7 8 INTRODUCTION PLANNING 2.1 TECHNICAL SPECIFICATIONS 2.2 REQUIREMENTS 2.3 MOUNTING OPTIONS 2.4 ELECTRICAL LAYOUT INSTALLATION 3.1 SAFETY AND TRANSPORT 3.2 PREPARATION OF INSTALLATION 3.3 MODULE INSTALLATION ELECTRICAL CONNECTION 4.1 SAFETY 4.2 ELECTRICAL INSTALLATION SAFETY 4.3 CONNECTION OF MODULES 4.
1 INTRODUCTION Validity 2 PLANNING 2.1 TECHNICAL SPECIFICATIONS For additional information see the relevant datasheet of the module provided at www.q-cells.us. These instructions are only valid for crystalline solar modules from the company Q CELLS as specified at chapter „2.1 Technical Specifications“. Q CELLS assumes no liability for damage resulting from failure to observe these instructions. Ä Please observe the wiring and dimensioning of the system.
2 PLANNING 2.1 TECHNICAL SPECIFICATIONS 2 PLANNING 2.2 REQUIREMENTS For additional information see the relevant datasheet of the module provided at www.q-cells.us. PRODUCT LINE Q.PEAK DUO ML-G10.2 Q.PEAK DUO ML-G10.4 Type Q.ANTUM DUO Z Q.ANTUM DUO Z Length [in] 74.0 (1879 mm) 74.0 (1879 mm) Width [in] 41.1 (1045 mm) 41.1 (1045 mm) Frame height [in] 1.26 (32 mm) 1.26 (32 mm) Area [yd²] 2.34 (1.96 m²) 2.34 (1.96 m²) Weight [lbs] 48.5 (22.0 kg) 48.5 (22.0 kg) Max.
2 PLANNING 2.3 MOUNTING OPTIONS 2 PLANNING 2.3 MOUNTING OPTIONS The module is considered to be in compliance with UL 61730 only when the module is either mounted in the manner specified by the mounting instructions, or when the mounting means has been evaluated with this PV module to UL 2703.
2 PLANNING 2.3 MOUNTING OPTIONS 2 PLANNING 2.3 MOUNTING OPTIONS Specifications MODULE TYPE POSITION OF CLAMPS* [IN (MM)] TEST LOAD PUSH / PULL** [PA] DESIGN LOAD PUSH / PULL** [PA] 5.12 - 13.8 (130 - 350) 5400 / 4000 3600 / 2660 0.79 - 19.7 (20 - 500) 5400 / 3600 3600 / 2400 0.79 - 25.6 (20 - 650) 2400 / 2400 1600 / 1600 11.8 - 19.7 (300 - 500) 2400 / 2400 1600 / 1600 9.45 - 13.8 (240 - 350) 4000 / 4000 2660 / 2660 FB1 15.6 (395.5) 5400 / 4000 3600 / 2660 FB2 15.6 (395.
2 PLANNING 2.4 ELECTRICAL LAYOUT 3 INSTALLATION 3.1 SAFETY AND TRANSPORT Module Selection Parallel Connection For detailed key electrical data, please refer to the product data sheet for the respective product. (available at www.q-cells.us) Ä For maximum energy yields, mismatches of specified electric current (IMPP) of more than 5 % should be avoided for all modules connected in series.
3 INSTALLATION 3.1 SAFETY AND TRANSPORT NOTE! Module damage may occur! Ä Never lift or move the module with the connection cables or junction box. Ä Carry modules upright and horizontally as shown. NOTE! Module damage may occur! Ä Do not drop modules. 3 INSTALLATION 3.2 PREPARATION OF INSTALLATION NOTE! Module damage may occur! Ä Never step on modules. Ä Do not subject modules to any mechanical stress. Ä Do not allow any objects to fall onto modules.
3 INSTALLATION 3.3 MODULE INSTALLATION Option 1: Ä Fasten the module with 4 clamps in the specified clamping range, see Fig. 3, p. 8. Ä Tighten clamps according to manufacturer’s instructions. 4 ELECTRICAL CONNECTION 4.1 SAFETY Ä Maintain an interval of at least 0.39 in (10 mm) between two modules along the short side and 0.20 in (5 mm) along the long side. n 0i ) 0.2mm (5 ) 0.39 in (10mm Option 2: Ä Install the module at the 4 mounting points, see Fig. 3, p. 8.
4 ELECTRICAL CONNECTION 4.2 ELECTRICAL INSTALLATION SAFETY DANGER! Risk of fatal injury due to electric shock! 4 ELECTRICAL CONNECTION 4.3 CONNECTION OF MODULES DANGER! Risk of fatal injury due to electric shock! Ä Electrical work may only be performed by qualified and skilled personnel (see page 3). Ä Ensure correct polarity. Ä Never plug or unplug the cable when under load. Modules must not carry any current. 1. Switch off the inverter.
4 ELECTRICAL CONNECTION 4.4 AFTER INSTALLATION Ä Ensure that all necessary safety and functional tests have been carried out according to applicable standards. Ä Integrate the system into the existing lightening protection system in accordance with the applicable local regulations. 5 NOTE! Module damage may occur! Ä Ensure that the plug connections are secured away from any water-channelling surface. WARNING! Fire Risk! Ä Do not use light concentrators (e.g. mirrors or lenses).
6 FAULTS AND DEFECTS DANGER! Risk of fatal injury due to electric shock! Ä Do not attempt to fix any problems yourself (e.g. glass cracks, damaged cables). Ä Please contact an installer or Q CELLS Technical Customer Service Department. 7 DISPOSAL Ä Do not disconnect modules yourself. Ä Please commission a trade specialist. Ä Dispose of modules in accordance with the local disposal regulations.
8 MAINTENANCE AND CLEANING NOTE! Module damage may occur! Ä Do not clean modules with water if there is a risk of frost. 0° Ä Free the substructure from any dirt and debris (leaves, bird nests, etc.). 24 INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO ML-G10.X – Q CELLS INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO ML-G10.
HANWHA Q CELLS AMERICA INC. 400 Spectrum Center Drive Suite 1400 Irvine, CA 92618 USA TEL +1 949 748 59 69 EMAIL inquiry@us.q-cells.com WEB www.q-cells.us Subject to change without notice. © Q CELLS Installation manual solar modules Q.PEAK DUO ML-G10.