Use and Care Guide

5. Electrical Requirements before spa delivery
Important
When installed in the United States, the electrical wir-
ing of this spa must meet the requirements of the
National Electric Code (NEC) and any applicable state
or local codes. The electrical circuit must be installed
by an electrical contractor and approved by a local
building/electrical inspector.
Electrical setup before delivery of your spa
1. All 240Volt spas must be permanently connected (hard
wired) to the power supply. Supplying power to the spa
which is not in accordance with these instructions will void
both the independent testing agencies listing and the
manufacturer’s warranty.
2. The power supplied to the spa must be a dedicated circuit
with no other appliances or lights sharing the power.
3. To determine the current, voltage and wire size required for
the spa configuration to be connected:
Wire size must be appropriate per NEC and/or local
codes. (Minimum #6 wire Required)
Wire size is determined by length of run from breaker box
to spa and maximum current draw.
Minimum # 6 copper wire with THHN insulation.
All wiring must be copper to ensure adequate
connections. Do not use aluminum wire.
14
ο
ο
ο
ο