Instructions
EN
46
Operating Manual: PX-1 - Smoke Alarm Device Operating Manual: PX-1 - Smoke Alarm Device
EN
47
 • Easy to maintain and removable ac-
cording to EN 14604:2005/AC:2008
 • or maintenance-unfriendly but 
theft-proof according to 
EN 14604:2005/AC:2008 
and vfdb 14/01 (Q)
Adhesive mounting according to 
EN 14604:2005/AC:2008
When performing this type of installation, 
proceed as follows:
(1)  Remove magnetic carrier from the device.
(Remove the splint from the activation 
button only after that)
 f To do this, tilt the magnetic carrier.
(2) Remove the protective lm from the 
adhesive pad on the magnetic carrier.
(3) Press rmly magnetic carrier for about 
10 seconds at the mounting position.
(4) Taking the device into operation.
 f Observe chapter 6 „Putting into 
operation“ on page 50.
(5) Put the device on the magnetic 
carrier.
 5 The device is mounted on the 
magnetic carrier.
The ultimate strength of the adhe-
sive bond is achieved after about 
72 hours.
Adhesive mounting ac-
cording to EN 14604:2005/
AC:2008 and vfdb 14/01 (Q)
To establish a permanent connection be-
tween the device and magnetic carrier  
according to vfdb 14/01 (Q), you can ad-
ditionally mount the device with the sup-
plied adhesive lm on the magnetic carrier.
5  Installation
The device is held by a magnetic carrier 
at the installation location. The magnetic 
carrier can be mounted by gluing or drill-
ing. It is imperative to observe the instruc-
tions in this manual and the general safety 
instructions in order to prevent injuries 
caused by incorrect installation.
CAUTION
Possible property damage!
Using other fastening material (not 
enclosed) or wrong conditions at the 
installation location can cause the 
device to fall down.
 f Use only the supplied mounting material 
(adhesive pad or screws /dowels).
 f Ensure that the mounting location is 
strong enough, solid, dry, free from 
grease, dust and loose paint etc.
 f Note that the magnetic carrier 
magnetically attracts only from one side.
5.1  Adhesive mounting
The magnetic carrier can be mounted us-
ing adhesive assembly as follows:
4.4 Rooms with a platform or gallery
0,5
1/2
0,50,5
>16 m² / >2 m 
1/2
Fig. 18  Rooms with a platform or gallery
Allowed
Not allowed
Note the following for rooms with plat-
forms or galleries (area greater than  
16 m
2
, at least 2 m long and wide):
 f Mount additional device under the 
platform / gallery.










