TM SAMIL POWER Expert for PV Grid-tied Inverters SolarRiver-D SolarR River-D DP PV VG Grid-tied riid-ttied d IInverter nvertter Product Manual SP-SR-D-V1.
Copyright Declaration The copyright of this manual belongs to Samil Power Co., Ltd. Any corporation or individual should not plagiarize, partially copy or fully copy it (including software, etc.), and should not reproduce or distribute it in any form or by any means. All rights reserved. Samil Power reserves the right of final interpretation. This manual changes according to user’s or customer’s feedback. Please check our website at www.samilpower.com for latest version.
02
CONTENTS 1 Notes On This Manual ......................................................................................................... 5 1.1 Scope Of Validity ................................................................................................................... 1.2 Target Group ..................................................................................................................... 1.3 Important safety information ..................................................................
7.2.5 Event list .................................................................................................................. 25 7.2.6 Settings ................................................................................................................... 25 8 Communication and Monitoring ....................................................................................... 27 8.1 Communication Interface .........................................................................................
Notes on This Manual 1 Notes on This Manual This manual is an integral part of the inverter. Please read the product manual carefully before installation, operation or maintenance. Keep this product manual for future reference. 1.1 Scope of Validity This product manual describes the assembly, installation, commissioning, maintenance of the following Samil Power SolarRiver-D series inverters. SolarRiver 3400TL-D SolarRiver 5000TL-D 1.
Notes on This Manual 1.6 Important Safety Instructions When using the product, please remember the below information to avoid the fire, lightning or other personal injury: Warning! Ensure input DC voltage ≤ Max.DC voltage .Over voltage may cause permanent damage to inverter or other losses, which will not be included in warranty! This chapter contains important safety and operating instructions. Read and keep this Operation Guide for future reference.
Grid-tied System brief introduction & Introduction of SolarRiver-D series inverter 2 Grid-tied System brief introduction The SolarRiver-D series inverter is a PV inverter which converts the DC current of a PV generator into AC current and feeds it into the public grid. PV modules Inverter Public grid Figure 1 PV Grid-tied System SolarRiver-D series inverter has the latest technology, and strictly observe well recognized safety procedures.
Introduction of SolarRiver-D series inverter 3.2 Electrical block diagram Electrical block diagram of SolarRiver-D series inverter is as figure2. Inverter DC SPD PV modules AC switch DC switch Leakage protection AC SPD Public grid DC SPD PV modules Figure 2 Electrical block diagram of SolarRiver-D series inverter 3.3 Principle description Principle description of SolarRiver-D series inverter is as figure3.
Introduction of SolarRiver-D series inverter 3.4 Protection function 【Grounding fault】 SolarRiver-D series inverter is designed as floating connection with PV( positive and negative terminals are not connected to ground ). When there is grounding fault, the inverter will be shut down and display grounding fault.
Introduction of SolarRiver-D series inverter & Operation Mode 3.7 Product label The product label provides basic information of the inverter, which is attached to the right side of the inverter. Pay special attention to the type of inverter and other specifications. TM TM TM PV Grid-tied Inverter www.samilpower.com Model: SolarRiver 3400TL-D TM PV Grid-tied Inverter www.samilpower.
Installation 5 Installation 5.1 Installation process ● Ready to install(refer to 5.2、5.3、5.4、5.5) Complete the preparation before installation: √ Read the user manual carefully; √ Check the products and parts; √ Inspection installation tools; √ Checkthe installation environment. ● Mechanical installation(refer to 5.6) Work during mechanical installation: √ Fix the panel of inverter; √ Install inverter. ● 5.2 Electrical connection(refer to 5.
Installation Table 1 packing list Type Equipment Accessories Files 5.3 Project No.
Installation ● ● ● ● ● ● ● ● ● ● The ambient temperature is out the range of -20°C to +60°C The altitude 2,000 m above sea level. Prone to be damaged by water. Close to corrosive gas or liquid (for example, locations where chemicals are processed or the location where feed lots of poultry). Exposed to direct sunlight. Prone to be flooded or covered by snow. Little or no air flow. Exposed to steam, vapor, or water. Exposed to direct cool air. Near the television antenna or antenna cable.
Installation 5.5 Installation tools Below tools are needed before installation. 5.6 Installation steps Step1: Drill holes in the wall with diameter 6mm driller according to the size of bracket. Keep drilling perpendicular to the wall, and don’t shake when drilling to avoid damage to the wall. Then put expansion pipe into the hole, use rubber hammer to tap the pipe into the wall completely. Put the bracket into expansion pipes and then use expansion screws to fasten bracket.
Installation Step2:Put the inverter onto the bracket. Step 3: Use M5 hex key nut to fix the bottom of the inverter. Step4: Lock the inverter and the bracket with lock for safety. (This is optional for users. User can select the lock according to your requirements).
Installation 5.7 Connections of the PV power system 5.7.1 Announcements Ensure that the DC side is not charged before installation and maintenance. But after DC side discharge for a period of time, the capacitor is still charged, so need to wait for 5 minutes to ensure that the capacitors is discharged. Before the electrical connection, make sure to use opaque material to cover the PV battery or disconnected the breaker of DC side. Exposure to the sun, PV array will produce a dangerous voltage. 5.7.
Installation Please use PV cable to connect arrays to inverter. From junction box to inverter, voltage drop is about 1-2%. So we suggest the inverter be installed near PV arrays, in order to save cable and reduce DC loss. Note! Please don’t connect the PV positive or negative to ground. 5.7.3 Connection steps of DC connector ● Assembly steps of DC connector Step1: Inserting the stripped conductor, Cross-sections 2.5 to 6 mm2, Outside diameter 5.0 to 8 mm, Stripping length 15 mm.
Installation 5.7.4 Assembly steps of AC connector SolarRiver series inverters are designed for single phase grid. Technical data should comply with the rule of local public grid.
Installation This product is equipped with IP66 AC connector. You can connect inverter AC side by yourself. Please see figure 15 for AC connector disassembling guide. Figure 15 AC connector disassembling guide Assembly steps of AC connector are as following: Step1: Put the AC wire through the threaded sleeve and pressure screw. Pressure screw Threaded sleeve Step2: Wire the AC side refer to following instructions.
Installation Step4: Screw down the threaded sleeve. Pressure screw Socket element with threaded sleeve Step5: Screw down the pressure screw. Threaded sleeve Pressure screw Step6: Connect AC connector to inverter. 5.7.5 Grounding Neither positive nor negative could grounding because of no transformer, or it wil break down. In the system, all non-current-carrying metal parts (such as shell of combiner, distribution and inverter) should be connected to the earth.
Run the inverter 6 Run the inverter 6.1 Safety inspection PV array Inspect the PV array to determine whether each PV array opening voltage meets the standard before operating the inverter. -Open-circuit voltage of PV arrays should be
Run the inverter Step1: language setting Move the cursor to select language, press "OK" to select and press "OK" to confirm. Language English German French Espana Italy Press OK to confirm Note: Language setting is independent to Grid-tied country setting. Step2: Grid-tied country setting Next interface is grid-tied country setting interface. Different countries have different grid safety rules. Move the cursor to select country, and then press “OK”to confirm. Then, press “OK” key to enter the next step.
Run the inverter Date/Time YYYY 2 0 MM 1 - 2 0 hh 1 0 : 3 DD - 0 3 mm 1 0 Left/Right : Move Selection Up/Down : Increase/Decrease value Press OK to confirm Step4:Check settings information LCD will display the settings information. Please check the settings information. If setting is wrong, please press the “ESC” to reset. If all the information is correct, please press “OK” to confirm, the inverter will save all the settings.
Operation 7 Operation 7.1 Control and Display Panel Control and Display Panel of SolarRiver inverter is shown as figure 18. Green LED Red LED 2012-03-03 10 : 00 : 00 Home Power kwh 0.0 W Today Total t LCD 208.4 V 205.9 V 0.0 KWh 0.0 KWh 1.045 kw = ~ Buttons 49.99 Hz Press Esc to Main Menu ESC OK S o larRiver Figure 18 HMI Interface There are 6 buttons: OK, ESC, UP, DOWN, RIGHT, LEFT. OK button: confirm the selection.
Operation 7.2 Interface setting 7.2.1 home interface Enter home interface automatically after startup (If not the home interface, press “ESC” return to the home interface), as shown in figure19. 2012-03-03 10 : 00 : 00 Home Power kwh Today Total t 208.4 V 205.9 V 0.0 W 0.0 KWh 0.0 KWh 1.045 kw = ~ 49.99 Hz Press Esc to Main Menu Figure 19 home interface 7.2.2 main menu In the home interface press “ESC” then enter the main menu, as shown in figure 20.
Operation 7.2.5 Event list Move the cursor to the" Event List" and then press “OK”, the user will see the list of events of inverter. Record 100 event information at most. Press the right or left keys to select events. 7.2.6 Settings Move the cursor to the" Settings" and then press “OK”, the user will enter the setting interface, as shown in figure 21.
Communication and Monitoring 8 Communication and Monitoring 8.1 Communication Interface Standard configuration: 1. Ethernet: Transmit the inverter working state such as output voltage, current, frequency, fault information to the PC machine or other monitoring system. Ethernet can achieve multi-inverter wired network at the same time. Optional configuration: WIFI: Wireless connect to route.
Communication and Monitoring Parameter setting when using router: Step 1:Enter home interface automatically after startup (If not the home interface, press “ESC” return to the home interface). 2012-03-03 10 : 00 : 00 Home Power kwh 0.0 W Today Total t 208.4 V 205.9 V 0.0 KWh 0.0 KWh 1.045 kw = ~ 49.99 Hz Press Esc to Main Menu Step 2: Press “ESC” in home interface then enter the main menu.
Communication and Monitoring Step 4: Move the cursor to "network", press "OK" and then enter "Input Password" interface. 2012-03-03 10 : 03 : 10 Input Password Please input customer password 0 Left/Right : Move Selection Up/Down : Increase/Decrease value Press Esc to Settings Step 5: Press "right" or "left" key to move the cursor to select the figure which need to be modified. Press "up" or "down" key to modify figure. If the password is correct will enter 'Ethernet" interface.
Communication and Monitoring Ethernet 2012-03-03 10 : 22 : 23 Auto-IP/DHCP Manud-IP Current mode: Manual-IP Press OK to confirm Ethernet 2012-03-03 10 : 22 : 50 Auto-IP/DHCP Manud-IP Current mode: Manual-IP Confirm? Press "OK" twice then will enter "Manual-IP" interface. Press "right" or "left" key to move the cursor to select the figure which need to be modified. Press "up" or "down" key to modify figure(IP Address: 192.168.000.002. Subnet Mask:255.255.255.000, others are 0).
Communication and Monitoring 8.2.2 RS485 Communication RS485 is generally for at most 32 inverters communication at the same time. But the length of communication wire should be≤1200m. You can read and analyse data by PC if the system is equipped with Solar-Log200/500/1000. Please refer to Solar-Log200/500/1000 manual for more information. Figure 23 RS-485 jack Two types of cable must be prepared before using Solar-Log to monitor mult-inverters. The communication cable between inverter and inverter: 1.
Communication and Monitoring The communication cable between inverter and Solar-Log: 1. One side of cable is the same as cable between inverter and inverter, the other side remains 4 colour wires: green white, green, orange white, orange, as shown in figure 25. Figure 25 2. Connect 4 colour wires to 1,4,5,6 port of Solar-Log. 1 green white 2 reserve 3 reserve 4 green 5 orange white 6 orange 8.2.3 WIFI communication You can connect inverter to Internet by router.
Communication and Monitoring WIFI settings: Note:Appendix is WIFI route list. Step1: Connect a cable following the steps of Ethernet before opening "SolarPower Browser". Step2: Double-click name of inverter to enter detail information page. Set the SSID of router which WIFI is going to be connected to and input the password(known from installation contractor) then save these information. Step3:Reboot the computer automatically and disconnect netting twine connection.
Communication and Monitoring The GUI bellow tells the WIFI hasn’t been set yet. 2012-03-03 10 : 28 : 10 Wifi Link Name: Press ESC to Back If WIFI has been set, shown as following figure. 2012-03-03 10 : 28 : 50 Wifi Link Name: BAFFAL0-5D8959 Press ESC to Back Hardware Requirements: router、inverter equipped with WIFI、PC(with SolarPower Browser software) 8.2.4 GPRS communication GPRS function is that sends fault message to user when inverter is at fault.
Communication and Monitoring Step3: Double-click name of inverter then enter detail information interface. Set the PIN code, service center number and customer mobile telephone number then save these information. Step4: Reboot the computer automatically. Step5: Check GPRS information: Enter the interface successively: Main Menu->Settings->Network, move the cursor to "GPRS" and press "OK".
Communication and Monitoring & Troubleshooting and maintenance If GPRS setting has been initialised, press "OK" to check the information, shown as following figure. GPRS Message 2012-03-03 10 : 32 : 06 PIN 1234 Center Number: +8613800510500 Customer Number: +8615000000000 Press OK to have a test! Press ESC to Back 9 Troubleshooting and maintenance 9.
Troubleshooting and maintenance When SolarRiver-D inverter is at fault, the fault information is composed of code, occurring time and fault description. Please contact Samil Power Co.,Ltd for further technical assistance. Please provide detailed installation information and inverter model, serial number and fault information. Table 5 Troubleshooting list Faults Grid volt / freq over / underrating Diagnosis and Solutions -Wait grid go back to normal working state.
Troubleshooting and maintenance & Decommissioning 9.2 Daily maintenance Inverters generally do not need any maintenance or calibration, but ensure air-cooling fin not be covered by any dust or dirties. Inverter cleaning Please use electric drier, soft dry cloth or brush to clean inverters. Water, corrosive chemical substance or intense cleaning agent are not allowed to clean the inverter.
Technical Data & Guarantees 11.4 General data Model SolarRiver 3400TL-D Dimensions(W/H/D) [mm] Weight [kg] Operating temperature range [°C] Ingress protection Topology Internal consumption (night) [W ] Cooling concept Noise (typical) [dB] LCD display Communication Standard warranty [year] SolarRiver 4000TL-D SolarRiver 4500TL-D SolarRiver 5000TL-D SolarRiver 5200TL-D 520 / 380/ 175 23 25 -20~+60 IP65 Tansformerless <3 Convection <30 3.