User Guide

16 Installation & Operation Manual Copyright © Puretec Pty Ltd 2023
Now programming is completed you are ready to start the system.
1. Fill the brine tank with ‘water soener’ salt to approximately half full (salt
not included).
This will require approximately 50 kg (this is only required initially).
2. Add approximately 15 litres of water to the salt in the brine tank. This is only required
for the initial setup.
Note: The water level will drop significantly aer the first backwash, and may
disapppear below the salt line. This is normal and no extra water will be required.
3. Open the nearest tap downstream of the filter system (aer the filter system).
4. Allow water to flow through the system slowly, and allow all air to escape out of the
closest tap. Wait until the water is flowing out of the tap and then increase the flow
slowly up to full flow. Allow to run for 5 - 10 minutes.
5. Close the opened tap and check for leaks.
6. Conduct a full manual regeneration.
7. Your system is ready for use.
MODEL CAPACITY OF SYSTEM (L) WITH DIFFERENT HARDNESS LEVELS
100 mg/L 200 mg/L 300 mg/L 400 mg/L 500 mg/L
SOL30-E3 10150 5075 3380 2537 2030
SOL40-E3 15400 7700 5130 3850 3080
E3 Valve
(Regeneration Time: 90 mins)
This will adjust regeneration automatically once you have entered the correct hardness level
in the programming section.
Regeneration
Start-up
Start-Up