Manual
B.
B.
B.
B. Function
Function
Function
Function of
of
of
of LCD
LCD
LCD
LCD IC
IC
IC
IC Controller
Controller
Controller
Controller
This
This
This
This is
is
is
is for
for
for
for RO-50/75/100G-C01,
RO-50/75/100G-C01,
RO-50/75/100G-C01,
RO-50/75/100G-C01, C02
C02
C02
C02 ,
,
,
, C
C
C
C 03,
03,
03,
03, C
C
C
C 04
04
04
04 Series
Series
Series
Series
1. P ower l amp is bright when starting machine, after 5 seconds , machine work s and automatically flush for 1
minute and 40 seconds, then display “ ” , w ater quality detector counts down to Zero.
2. A nd then enters into the stat e of producing water, display “ ” , the digital change s circularly. Display the
current water quality: If TDS surpasses 38PPM, system alarm s ; and should inspect the problem , flush or change
the membrane.
3. When producing water full, display “ ” , after the pump work for more 20 seconds the machine stop
working. (After water used, enters into the water producing stat e again.) Display the current water quality .
4. Lack water source or water pressure not high enough, system alarm s automatically , display ” ┫ ” , TDS display
“ ---- ” , and attend by “ di---di--- ” alarm s continuously .
5. After the machine producing water accumulative ly amount to 7.5 hours , enter s into the flushing state
automatically , flush es for 1 minute and 40 seconds . Water quality detector counts down to Zero. ( Circularly )
6. If the machine longtime working doesn ’ t stop, the machine alarm s and stops automatically , display “ ” , water
quality display “ ” , and “ di---di--- ” alarm s continuously . ( Note : Please make the machine stop
working, examine & repair or exchange the Membrane .)
7. Pressure the “ strong flush ” button, display “ ” , automatically flushes for 1 minute and 3 0 seconds and then
enter into water producing state , w ater quality detector counts down to Zero.
Ⅸ .
.
.
. STARTING
STARTING
STARTING
STARTING UP
UP
UP
UP YOUR
YOUR
YOUR
YOUR RO
RO
RO
RO SYSTEM
SYSTEM
SYSTEM
SYSTEM
1.
1.
1.
1. Turn on cold water supply valve and feed water valve, but close the tank ball valve.
2.
2.
2.
2. Open the goose faucet. (Pull the b lack handle to the open position).
3.
3.
3.
3. Check the system, whether leak or not.
4.
4.
4.
4. After about 5 minutes, the water starts dripping out of the goose faucet, and let it drip for about 10 minutes,
push the handle to the closed position. It will take several hours (about 3.5) for filling up the pressure tank
depending on local water pressure.
DO NOT DRINK THE
WATER
OF THE FIRST TANK PRODUCED BY YOUR NEWLY PURCHASED
SYSTEM.
5.
5.
5.
5. When the tank is full (you will know the water producing stop), flush the system by pilling the goose faucet to
the open position until the water is completely discharged.
6.
6.
6.
6. Upon completely discharging the water of pressure tank, push the handle to closed position on goose faucet,
and then start the water producing process again . This process should take about 2-2.5 hours until full.
7.
7.
7.
7. After the second tank is filled, now you can enjoy the purified water.
8.
8.
8.
8. Check for leaking daily at the first week and periodically after one week.
9.
9.
9.
9.
You
may notice milky colored water at the first week. It is the air bubble in the water. It is normal and safe.