Installation Guide
6
CustomerService@GQBrands.comGQBrands.com
1-866-498-5269
ASSEMBLY INSTRUCTIONS
STEP 1
Parts:
Part 1 (x2) - Base Rail
Part 2 (x2) - Base Bar
Part 4 (x2) - Arm A
Part 7 (x2) - Arm B
Part 10 (x4) - M6x40mm Bolt
Part 11 (x4) - M6 Washer
Part 12 (x4) - M6 Nut
Attach both Base Rails and Base Bars to
create the bottom frame of the seesaw.
Install both Arm A & Arm B from the outside
of the frame using the hardware provided.
Repeat this step in both sides of the frame.
NOTE: Make sure to install the bolts from the
outside, with washer and nuts on the inside
of the frame to avoid injury.
NOTE: The Side Rails will have 12 openings
on the side and 4 on the bottom. Make sure
that all bottom openings are facing the floor.
Align the openings of the Side Rails hooks to
the bottom openings of the Arms A & B.
NOTE: Make sure to install the bolts from the
outside, with washer and nuts on the inside
of the frame to avoid injury.
STEP 2:
Parts:
Part 8 (x2) - Side Rails
Part 10 (x4) - M6x40mm Bolt
Part 11 (x4) - M6 Washer
Part 12 (x4) - M6 Nut
4
7
7
4
1
1
2
2
10
10
10
10
10
10
10
10
8
8
4
1
1
11
11
11
11
12
12
12
12
7
7
4
11
11
11
11
12
12
12
12