Solenoid-driven Diaphragm Metering Pump PZ Series OPERATION MANUAL Please read this OPERATION MANUAL carefully before use. Operating the pump incorrectly in disregard of these instructions may lead to death, injury and/or cause property damage. Applicable Models PZ-31/61/12 ARPZ-31/61/12 This illustration is for PZ-31 7Thank you for purchasing this TACMINA product. Please read this OPERATION MANUAL carefully in order to ensure that you will use the product safely and correctly.
How to operate the pump safely In order to ensure that the pump will be operated correctly and safely, this OPERATION MANUAL contains some guidelines for the user in the form of important safety precautions and considerations which, depending on their seriousness, are categorized as set forth below. Be absolutely sure to heed these precautions and considerations.
• When using a pump without a relief-valve function, be absolutely sure to install a relief valve on the pipe right outside the pump on the discharge side. If the user has forgotten to open the valve or foreign matter is clogged inside the pump’s discharge-side pipe, this may cause the pressure to rise above the pump’s specifications range, liquid to gush out, the pipes to become damaged and/or the pump to malfunction, all of which are dangerous.
Checking out the product ............................................................................................................5 Accessories list ............................................................................................................................5 Description of product .................................................................................................................7 Names of the parts .............................................................................
Introduction Checking out the product After unpacking the pump, check the following. • Is the pump the one that was ordered? • Do the details on the pump’s nameplate match what was ordered? • Is all the accessories supplied? ✽ Check the supplied accessories against the “Accessories list” below.
Accessories list Liquid-end Material FEC (PP) Model 31 Discharge side (3m) Tube Introduction Model for injection of boiler chemicals: PZ-31-FEC (PP) PP tube (1/8"×1/4") Suction side (2m) PE tube (1/4"×3/8") Relief/air-release hose (1m, installed) Soft PVC hose (4×6) INSULOK (spare) for Relief/air-release hose 1 piece Anti-siphon check valve 1 set (R1/2) Foot valve 1 set Ceramic weight 1 set Pump-mounting nuts/bolts 2 sets (M5×30) Operation manual 1 copy Model for injection of sodium
Introduction Description of product This is a solenoid-driven diaphragm metering pump with liquid-end parts which are resistant to chemicals and with a compact body. It can be operated on any supply voltage from AC 100V to AC 240V (±10%). Its discharge capacity has been adjusted so that it will remain constant over the supply voltage range.
Installing the product ! WARNING • This pump does not have explosion-proof specifications. Do not install it in explosion-proof regions or in explosive or combustible atmospheres. • Install the pump in a location that cannot be accessed by anyone but control personnel. CAUTION • Do not install the pump where there is a risk of flooding or where there are high levels of moisture or dust. Doing so may cause electric shocks and/or malfunctions.
Piping Installation ! CAUTION • Connect the pipes to the pump properly. • Do not connect the pipes above a passageway. Do not install the pipes where the chemical may splash onto people even if the hose/tube should break. • When using a pump with a relief-valve function, always attach a hose for relief purposes, and lead the end of the pipe back to a tank or other container.
Piping Model for injection of general chemicals: PZ-31/61/12-VEC/VFC/FEC/FFC/FTC ■When installing the pump below the tank Injection point (1) Connect the suction valve of the tank and the suctionside joint of the pump using the hose/tube. (2) Connect the discharge-side joint of the pump and main pipe (injection point) using the tube. When doing this, attach the anti-siphon check valve at the injection-point side end of the tube.
Piping Model for injection of boiler chemicals: PZ-31-FEC (PP) Installation Installation is described with an example using PZ-31-FEC (PP) and TACMINA tank. • If the valve has not been opened or clogging by foreign matter has occurred inside the pipe at the discharge side of the pump, the chemical will gush out from the relief/air-release port. Therefore, always have a relief/air-release hose installed, and lead its end back into the tank or other container.
Piping Installation is described with an example using PZ-31-CL and TACMINA tank. • It is extremely dangerous for the user to forget to open the valve or for there to be the clogging of foreign matter inside the pump’s discharge-side pipe. Be absolutely sure to install a relief valve, which will automatically release abnormally high pressure levels, on the discharge-side pipe. • Install a valve for releasing abnormal pressure that has built up inside the discharge-side pipe.
Piping Installation Model w/ automatic air-release function for injection of sodium hypochlorite: ARPZ-31/61/12 Installation is described with an example using ARPZ-31 and TACMINA tank. • Unlike other models, this pump has a discharge-side joint at the front of the pump head and an air-release side joint on its top. • It is extremely dangerous for the user to forget to open the valve or for there to be the clogging of foreign matter inside the pump’s discharge-side pipe.
Connecting Model Liquid-end material Hose/tube Page PZ-31/61/12-VEC/VFC Discharge side : PE tube Suction side : PVC braided hose 14 PZ-31/61/12-FEC/FFC PE tube PZ-31/61/12-FTC FEP tube Model for injection of boiler chemicals PZ-31-FEC (PP) Discharge side : PP tube Suction side : PE tube 18 Model for injection of sodium hypochlorite PZ-31/61/12-CL Discharge side : PE tube Suction side : PVC braided hose 20 Model w/ automatic air-release function for injection of sodium hypochlorite ARPZ-3
Connecting ■Anti-siphon check valve Installation This pump is provided with an anti-siphon check valve. Use this valve at the injection point unless there is a good reason not to do so. Be absolutely sure to install it in the following cases. • When the injection point is open to the atmosphere and liquid is to be injected at a position lower than the level of the liquid in the tank (prevention of siphoning) • When the liquid is to be injected inside the suction-side pipe of a volute pump, etc.
Connecting Model for injection of general chemicals: PZ-31/61/12-FEC/FFC/FTC • When bending the tube, provide sufficient leeway in the bending so that the tube will not break. Also ensure that it will not be rubbed against or trodden on. • Insert the tube firmly so that it will not become disconnected, and tighten the nuts securely. Do not excessively tighten the nuts. Doing so may damage or break the joint.
Connecting ■Anti-siphon check valve Installation This pump is provided with an anti-siphon check valve. Use this valve at the injection point unless there is a good reason not to do so. Be absolutely sure to install it in the following cases. • When the injection point is open to the atmosphere and liquid is to be injected at a position lower than the level of the liquid in the tank (prevention of siphoning) • When the liquid is to be injected inside the suction-side pipe of a volute pump, etc.
Connecting Model for injection of boiler chemicals: PZ-31-FEC(PP) • When bending the tube, provide sufficient leeway in the bending so that the tube will not break. Also ensure that it will not be rubbed against or trodden on. • Insert the tube firmly so that it will not become disconnected, and tighten the nuts securely. Do not excessively tighten the nuts. Doing so may damage or break the joint.
Connecting ■Anti-siphon check valve Installation This pump is provided with an anti-siphon check valve. Use this valve at the injection point unless there is a good reason not to do so. Be absolutely sure to install it in the following cases. • When the injection point is open to the atmosphere and liquid is to be injected at a position lower than the level of the liquid in the tank (prevention of siphoning) • When the liquid is to be injected inside the suction-side pipe of a volute pump, etc.
Connecting Model for injection of sodium hypochlorite: PZ-31/61/12-CL • When bending the hose/tube, provide sufficient leeway in the bending so that the hose/tube will not break. Also ensure that it will not be rubbed against or trodden on. • Insert the hose/tube firmly so that it will not become disconnected, and tighten the nuts securely. Do not excessively tighten the nuts. Doing so may damage or break the joint.
Connecting Model w/ automatic air-release function for injection of sodium hypochlorite: ARPZ-31/61/12 Installation ■PVC braided hose/PE tube • Unlike other models, this model has a discharge-side joint at the front side of the pump head and an air-release joint on its top. • When bending the hose/tube, provide sufficient leeway in the bending so that the hose/tube will not break. Also ensure that it will not be rubbed against or trodden on.
Connecting ■Anti-siphon check valve w/ duck-bill cap (1) The anti-siphon check valve with duck-bill cap has an R1/2 external thread. Provide an Rc1/2 internal thread at the injection point. (2) Wind sealing tape around the external thread of the anti-siphon check valve with duck-bill cap, and screw the valve into the injection point. ✽ If it is hard to screw the valve in, grasp the nozzle grip using a tool such as pliers, and tighten the valve gently.
Electrical wiring ! WARNING ! CAUTION • The wiring must be done by a qualified electrician or somebody with electrical knowledge. • Connect the wires after checking the supply voltage. Do not connect the wires to a power supply that is not within the rated voltage range. Power cable (2m) is already attached. Example of wiring ●When operating the pump in tandem with an irrigation pump, etc.
Electrical wiring Recommended protection devices Manufacturer Model Mitsubishi Electric CP30-BA2P1-M3A Fuji Electric CP32D/3 Matsushita Electric Works BAC201305 (2) Lightning arrestors Manufacturer For AC 100V For AC 200V M-System Co. MA-100 MA-200 (3) Line filters, sealed transformers Manufacturer Model TDK ZMB2202-11 noise filter Aihara Electric Co.
Operating precautions ! WARNING • Ensure that nobody other than the operators and control personnel will operate the pump. • Do not operate the pump with wet hands. Doing so may result in electric shocks. • When trouble has occurred (such as when smoke appears or there is a smell of burning), shut down the pump’s operation immediately, and contact your vender or a TACMINA representative. Otherwise, a fire, electric shocks and/or malfunctions may result.
Air releasing ! WARNING • During the air releasing, chemical may suddenly gush out from the pipes and other parts. Lead the end of the relief/air-release hose bank to the tank or other container, and secure it so that it will not become disconnected. IMPORTANT • When using the pump for the first time or when the chemical container has been replaced, proceed with the task of air releasing prior to operating the pump.
Air releasing Model for injection of sodium hypochlorite: PZ-31/61/12-CL (1) Insert the air-release hose provided into the air-release port. (2) Return the other end of the air-release hose to the tank or other container, and secure it firmly. Airrelease port Operation Air-release hose (3) Turn off the pump’s power, and release the pressure inside the discharge-side pipe. (4) Set the discharge volume to the maximum level. (See page 28) (5) Turn on the pump’s power to start operating the pump.
Discharge-volume setting • The stroke speed can be adjusted by turning the stroke-speed adjustent dial located at the back of the pump. 40 50 60 70 30 P L 20 80 10 90 0 100 SPEED(%) Adjustable range of stroke speed: 15 to 300 strokes/min Operation ✽ When the dial is moved while the pump is stopped, the dial setting may shift during pump operation. If this happens, adjust the dial again.
Maintenance precautions ! WARNING • Ensure that nobody other than the operators and control personnel will operate the pump. • Take steps to ensure that the power will not be turned on during the course of work. Hang a sign on the power switch indicating that work is in progress. • Do not operate the pump with wet hands. Doing so may result in electric shocks.
Replacing the diaphragm ✽ This instruction is described with an example using PZ-31 (VEC type). IMPORTANT • When securing the pump head using the head bolts, tighten them up evenly a little at a time in the sequence shown in the figure on the right. If, for instance, the bolts are tightened up in the sequence of 1 → 3 → 2 → 4, the bolts will be tightened unevenly, possibly causing the chemical to leak from the pump head. 1 3 4 2 Removing the diaphragm (1) Remove the head bolts.
Replacing the valve seats and check balls IMPORTANT • Install the parts in the correct sequence and correct directions. • Pay special attention to the sequence and directions for the joints and valve seat assemblies. • Check the O-ring, check balls and valve seats for damage and dirt.
Replacing the valve seats and check balls ■Liquid-end material: FTC Discharge-side joint Seat packing Ball stopper Check ball Valve seat Seat packing Ball stopper Check ball Valve seat Head bolt (cross-recessed machine screws) O-ring (size: P12) Maintenance Pump head Valve seat assembly* Discharge-side joint assembly Tube fitting Relief valve* Air-release nozzle assembly* Ball stopper Suction-side joint assembly Check ball Valve seat Seat packing Ball stopper Check ball Valve seat assembly* O-r
Replacing the valve seats and check balls Model for injection of boiler chemicals: PZ-31 Model for injection of sodium hypochlorite: PZ-31/61/12-CL ■Liquid-end material: FEC (PP) ■Liquid-end material: CL Pump head Ball stopper Check ball Valve seat Ball stopper Check ball Valve seat O-ring (size: P14) Valve seat assembly* Discharge-side joint Pump head Retaining ring Discharge-side joint Spacer Ball stopper Check ball Valve seat Ball stopper Check ball Valve seat O-ring (size: P12) Valve seat asse
Replacing the valve seats and check balls Model w/ automatic air-release function for injection of sodium hypochlorite: ARPZ-31/61/12 ■Liquid-end material: CL Nut e sid join - rge a ch Dis se t as ea ve s ly (d mb a Valve seat Spacer Check ball (6.35 mm diameter) Maintenance Valve seat Guide ring O-ring (size: P14) Pump head * ide) isch Duck-bill valve -s rge Val O-ring (size: P14) Valve seat Check ball (6.
Replacing the relief valve ✽ This instruction is described with an example using PZ-31 (VEC type). IMPORTANT Take the following action when the relief-valve function has been activated by clogging of the dischargeside pipe, for instance. • Shut down the pump immediately, remove the cause of the trouble, and take steps to prevent its recurrence. • The relief valve is a consumable. Replace it once it has been activated.
36
Troubleshooting ! WARNING • Ensure that nobody other than the operators and control personnel will operate the pump. • Take steps to ensure that the power will not be turned on during the course of work. Hang a sign on the power switch indicating that work is in progress. • Do not operate the pump with wet hands. Doing so may result in electric shocks.
Troubleshooting Cause Remedy Trouble The pump Air has (1) A liquid which easily vaporize is being used. (1) Dilute the liquid. runs, but found its (2) Air has entered from a joint or seal to (2) Tighten the parts from which the liquid is leaking. no liquid is way inside. become mixed with the liquid. pumped. (3) The tank is empty. (3) After replenishing the liquid, proceed with air releasing. (1) Clean the strainer and the tank. No liquid is (1) The strainer is clogged. (2) Proceed with air releasing.
Model code ✽ When selecting the pump model, first check the "Liquid-end material" and "Specification". Model for injection of general chemicals PZ - 31 - VEC - 1/4×3/8PE - W - S - ULP - NPR (1) (2) (3) (4) (5) PZ - 31 - FEC/FFC - 1/4×3/8PE - W - S - ULP - NPR (6) (1) (1) Model (discharge volume standard) Model 31 61 12 Model 31 61 12 Type FEC FFC (3) Hose standard Size (I. D. X. O. D.
Model code ✽ When selecting the pump model, first check the "Liquid-end material" and "Specification". Model for injection of boiler chemicals PZ - 31 - FTC - 1/4×3/8FEP - W - S - ULP - NPR (1) (2) (3) (4) (5) PZ - 31 - FEC - 1/8×1/4PP - W - S - ULP - NPR (6) (1) (1) Model (discharge volume standard) Model 31 61 12 FTC PTFE Model 31 Ceramic O-ring Super fluororubber pafulo® Type FEC Size 1/4"×3/8" Material FEP tube Code W 1/8×1/4 PP O-ring EPDM Size (I. D. X. O. D.
Model code ✽ When selecting the pump model, first check the "Liquid-end material" and "Specification". Model for injection of sodium hypochlorite Model w/ automatic air-release function for injection of sodium hypochlorite PZ - 31 - CL - 1/4×3/8PE - W - S - ULP - NP ARPZ - 31 - CL - 1/4×3/8PE - W - S - ULP - NP (1) (2) (4) (3) (5) (6) (1) Discharge volume 30 mL/min 60 mL/min 100 mL/min Model 31 61 12 (2) Liquid-end material Type CL Type CL (3) Hose standard (size/material) Code Size (I. D.
Liquid-end material Model Model for injection of boiler chemicals Model for injection of general chemicals Model for injection of sodium hypochlorite Model w/ automatic air-release function for injection of sodium hypochlorite PZ Part VEC Pump head VFC FEC ARPZ FFC PVC FTC FEC (PP) PVDF CL CL Acrylic (PMMA) Diaphragm PTFE Check ball Ceramic O-ring EPDM Fluororubber EPDM Fluororubber Special fluororubber Pafulo® EPDM Fluoro-rubber Valve seat EPDM Special fluororubber EPDM Sp
Specification Model for injection of general chemicals: PZ 31 Model Specification Max. discharge volume* Max. discharge pressure* Stroke speed 61 G/h 0.5 1.0 1.6 L/h 1.8 3.6 6.0 MPa psi 1.0 145 0.8 116 15 to 300 strokes/min (dial setting) 0.4 58 Stroke length Discharge side Fixed at 1.0 mm PE tube FEP (1/4"×3/8", 3m) tube PE tube PE tube Connection (1/4" (1/4"×3/8", 5m) (1/4"×3/8", 5m) (hose/tube: ×3/8", PVC braided PVC braided I.D×O.
Specification Model for injection of boiler chemicals: PZ 31 Model Specification Max. discharge pressure* Stroke speed G/h 0.44 L/h 1.68 MPa psi 1.5 217 15 to 300 strokes/min (dial setting) Stroke length Discharge side Connection (hose/tube: Suction side I.D×O.D) Relief/ air-release Max. allowable viscosity Fixed at 1.0 mm PP tube (1/8"×1/4", 3m) PE tube (1/4"×3/8", 2m) Soft PVC hose (4×6, 1 m) 50 mPa.
Specification Model for injection of sodium hypochlorite: PZ Model 31 61 12 G/h 0.5 1.0 1.6 L/h 1.8 3.6 6.0 MPa psi 1.0 145 0.8 116 15 to 300 strokes/min (dial setting) 0.4 58 Specification Max. discharge volume* Max. discharge pressure* Stroke speed Stroke length Discharge side Connection (hose/tube: Suction side I.D×O.D) Air-release Fixed at 1.0 mm PE tube (1/4"×3/8", 3m) PVC braided hose (1/4"×3/8", 2m) Soft PVC hose (4×6, 1 m) 50 mPa.s Specifications Max.
Specification Model w/ automatic air-release function for injection of sodium hypochlorite: ARPZ 31 61 12 Max. discharge volume* G/h 0.42 0.84 1.47 L/h 1.6 3.2 5.6 Max. discharge pressure* Stroke speed MPa psi 1.0 145 0.8 116 15 to 300 strokes/min (dial setting) 0.4 58 Stroke length Discharge side Connection (hose/tube: Suction side I.D×O.D) Air-release Fixed at 1.0 mm PE tube (1/4"×3/8", 3m) PVC braided hose (1/4"×3/8", 2m) Soft PVC hose (4×8, 1 m) 50 mPa.s Max.
Performance curve • The performance curves below represent the measurements taken under the conditions prevailing at TACMINA’s test facilities, and are provided here as examples. • The individual conditions prevailing on-site and differences between models may produce minor variations from these curves. • Measure the discharge volume using the conditions under which the pump will actually be used, and set the stroke speed in accordance with the applicable performance curve.
Performance curve Model for injection of sodium hypochlorite: PZ-31/61/12-CL PZ−31−CL PZ−61−CL PZ−12−CL Conditions: clean water, room temperature Conditions: clean water, room temperature Conditions: clean water, room temperature 0.2MPa (29psi) 0.6 1.0MPa (145psi) 0.5 0.4 0.3 0.2 0.1 0 15 60 1.0 0.8 0.6 0.4 0.2 0 120 180 240 300 Stroke speed (strokes/min) 0.2MPa (29psi) 0.8MPa (116psi) 1.2 15 60 1.8 Discharge volume (L/h) 1.4 Discharge volume (L/h) Discharge volume (L/h) 0.
External dimension Model for injection of general chemicals: PZ-31/61/12-VEC/VFC/FEC/FFC/FTC PZ−31/61/12-VEC/VFC 76 (120) UP 76 8 130 PVC (206) 152 E OP N 16.5 118 70 110 (150.5) PZ−31/61/12-FEC/FFC/FTC 97.5 (120) (195) 8 130 PVDF 97.5 (227.5) UP 17.5 118 69.5 Model for injection of boiler chemicals: PZ-31-FEC (PP) 97.5 (120) (195) 130 PVDF 97.5 (227.5) UP 8 Specifications 110 142 17.5 118 69.
External dimension 76 Model for injection of sodium hypochlorite: PZ-31/61/12-CL 8 130 76 (206) 152 OP E N 16.5 118 70 110 (150.
Consumables • Failure to replace the consumables may cause discharge (or injection) trouble and/or malfunctions. • The replacement timeframes of the consumables have been determined under the prescribed conditions (clean water, room temperature) prevailing at TACMINA’s test facilities. • Since these timeframes will differ under the individual conditions prevailing on-site, use them as a general guide, and replace the consumables at an earlier rather than later date.
Consumables Model for injection of sodium hypochlorite: PZ-31/61/12-CL Part Valve seat assembly (discharge side) Valve seat assembly (suction side) Diaphragm assembly (diaphragm, protective diaphragm, spacer) Air-release nozzle assembly Quantity per pump 31/61/12 1 1 1 1 Recommended replacement timeframe Every 10,000 hours Every 10,000 hours Every 10,000 hours Every 10,000 hours Model w/ automatic air-release function for injection of sodium hypochlorite: ARPZ-31/61/12 Part Valve seat assembly (discharge
Spare parts & options ■Spare parts • Nuts • Retaining rings • Joints • Air-release nozzles ■Options • Back pressure valve This valve prevents overfeeding*1 and siphoning*2 phenomena by sealing the chemical outlet with a diaphragm and applying just the right amount of pressure (back pressure) to suppress the in-ertia force of the fluid.
After-sales services Warranty Repairs (1) The warranty period is one (1) year from the date of purchase. (2) If, during the warranty period, the product sustains malfunctions or damages despite normal use and proper maintenance as a result of design or manufacturing defect, TACMINA will arrange for repair of the product at no charge to the customer.
EMM-001(1)1 2008/3/DDD